Study on disruption management strategy of job-shop scheduling problem based on prospect theory

被引:32
作者
Ning Tao [1 ,2 ]
Wang Xu-ping [2 ]
机构
[1] Dalian Jiaotong Univ, Inst Software, Dalian 116045, Peoples R China
[2] Dalian Univ Technol, Inst Syst Engn, Dalian 116023, Peoples R China
基金
中国博士后科学基金;
关键词
Disruption management; Uncertain job-shop scheduling; Psychological perception; Prospect theory;
D O I
10.1016/j.jclepro.2018.05.139
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In view of the disturbance in the process of uncertain job-shop scheduling problem, the measurement method of value function based on prospect theory and the disruption management strategy of user's psychological perception are proposed in this paper. A multi-objective optimization model for job-shop scheduling management is established through multi-objective programming. At the same time, the idea of gradual optimization for the target to obtain the job-shop scheduling adjustment scheme with minimum disturbance is introduced. Acting the user's psychological perception time as the reference point, the degree of the user's psychological perception of the expected time of goods is measured. In order to optimize the scheduling model and search the optimum solution of multi-objective optimization problem, an improved quantum bacterial foraging algorithm is proposed, and it is compared with the existing classical algorithms to verify its effectiveness. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:174 / 178
页数:5
相关论文
共 18 条
[1]   Optimal position of supply chain delivery window: Concepts and general conditions [J].
Bushuev, Maxim A. ;
Guiffrida, Alfred L. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 137 (02) :226-234
[2]   Numerical optimization using synergetic swarms of foraging bacterial populations [J].
Chatzis, Sotirios P. ;
Koukas, Spyros .
EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (12) :15332-15343
[3]  
[丁秋雷 Ding Qiulei], 2016, [运筹与管理, Operations Research and Management Science], V25, P68
[4]   AHP-Based Evaluation Model for Optimal Selection Process of Patching Materials for Concrete Repair: Focused on Quantitative Requirements [J].
Do, Jeong-Yun ;
Kim, Doo-Kie .
INTERNATIONAL JOURNAL OF CONCRETE STRUCTURES AND MATERIALS, 2012, 6 (02) :87-100
[5]   Customer acceptance mechanisms for home deliveries in metropolitan areas [J].
Ehmke, Jan Fabian ;
Campbell, Ann Melissa .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 233 (01) :193-207
[6]   Cost Modelling and Simulation of Last-mile Characteristics in an Innovative B2C Supply Chain Environment with Implications on Urban Areas and Cities [J].
Gevaers, Roel ;
Van de Voorde, Eddy ;
Vanelslander, Thierry .
EIGHTH INTERNATIONAL CONFERENCE ON CITY LOGISTICS, 2014, 125 :398-411
[7]   Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems [J].
Kacem, I ;
Hammadi, S ;
Borne, P .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2002, 32 (01) :1-13
[8]   Innovative products and services for sustainable societal development: Current reality, future potential and challenges [J].
Kantola, Jussi ;
Liu, Yang ;
Peura, Pekka ;
de Leeuw, Tim ;
Zhang, Yingfeng ;
Naaranoja, Marja ;
Segev, Aviv ;
Huisingh, Donald .
JOURNAL OF CLEANER PRODUCTION, 2017, 162 :S1-S10
[9]  
Li Lin, 2010, Control Theory & Applications, V27, P1293
[10]  
Liu Ming, 2011, Control and Decision, V26, P96