Commissioning of the ALPI post-accelerator

被引:19
作者
Dainelli, A
Bassato, G
Battistella, A
Bellato, M
Beltramin, A
Bertazzo, L
Bezzon, G
Bisoffi, G
Boscagli, L
Canella, S
Carlucci, D
Cervellera, F
Chiurlotto, F
Contran, T
DeLazzari, M
Facco, A
Favaron, P
Fortuna, G
Gustafsson, S
Lollo, M
Lombardi, A
Marigo, S
Moisio, MF
Palmieri, V
Pengo, R
Pisent, A
Poggi, M
Poletto, F
Porcellato, AM
Ziomi, L
机构
[1] INFN, Laboratori Nazionali di Legnaro
关键词
D O I
10.1016/S0168-9002(96)00456-1
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The commissioning phase of the ALPI post-accelerator started at the beginning oi 1994 with the installation of the medium beta section (beta = 0.11). Test beams of different injection energies and ion species have been accelerated with ALPI and delivered to the experimental hails. The main components of the post-accelerator. namely the cryogenic plant, the pulsing system, the optical and diagnostic elements for the beam transport, the vacuum, rf and control systems was widely tested under different conditions. The average accelerating field over the 44 installed superconducting lead on copper resonators turns out to be 2.5 MV/m and the phase looking procedure for the 48 resonators (accelerating and buncher cavities) is normally completed in about 10 hours. The overall beam transmission towards the post-accelerator is 70% with the DC beam and up to 50% with the pulsed and accelerated beam with currents on the target of the order of some pnA.
引用
收藏
页码:100 / 106
页数:7
相关论文
共 17 条
[1]  
BADAN L, 1994, P 4 EUR PART ACC C L, P143
[2]   Design and tests for the fast Faraday cup of the ALPI post-accelerator [J].
Bellato, M ;
Dainelli, A ;
Poggi, M .
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1996, 382 (1-2) :118-120
[3]  
BELLATO M, 1994, P 4 EUR PART ACC C L, P1512
[4]  
BELLATO M, 1992, P 3 EUR PART ACC C B, P1085
[5]  
BRODA R, IN PRESS PHYS REV C
[6]   Final installation of the alice ECR ion source [J].
Cavenago, M .
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1996, 382 (1-2) :288-291
[7]   COMMISSIONING OF THE ECR ION-SOURCE ALICE [J].
CAVENAGO, M ;
BISOFFI, G .
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1993, 328 (1-2) :262-265
[8]  
DAINELLI A, 1990, P 2 EUR PART ACC C N, P1291
[9]   Experience with the low beta resonators at LNL [J].
Facco, A ;
Sokolowski, JS ;
Andreev, V ;
Bassato, G ;
Chiaveri, E ;
Favaron, P ;
Zvyagintsev, V .
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1996, 382 (1-2) :107-111
[10]   A HIGH-SENSITIVITY PHASE STABILIZING SYSTEM AND BEAM CURRENT MONITOR [J].
FACCO, A ;
RUDOLPH, K ;
BASSATO, G ;
BATTISTELLA, A .
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1994, 337 (2-3) :253-257