Evaluation of the potential of central receiver solar power plants: Configuration, optimization and trends

被引:93
作者
Avila-Marin, Antonio L. [1 ]
Fernandez-Reche, Jesus [2 ]
Tellez, Felix M. [3 ]
机构
[1] Plataforma Solar Almeria CIEMAT, E-28040 Madrid, Spain
[2] Plataforma Solar Almeria CIEMAT, E-04200 Tabernas Almeria, Spain
[3] Astrom Tech Advisors, Madrid, Spain
关键词
Levelized electricity cost; Molten nitrate salts; Direct steam generation; Steam; Thermal energy storage; Central receiver; DIRECT STEAM-GENERATION;
D O I
10.1016/j.apenergy.2013.05.049
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
080707 [能源环境工程]; 082001 [油气井工程];
摘要
This paper presents a parametric analysis for a medium to large size (290-500 MWth receiver thermal power) central receiver plant considering the present market trends. The analysis is divided in 4 steps: Size and location analysis: for a medium to large size central receiver power plant, three turbine power and three different locations that are involved in the development of power tower plants, have been analyzed to assess the impact over the design characteristics of the solar field and receiver sub-systems and over the levelized electricity cost. Technology analysis; as commercial power tower plants in. operation today are mainly using steam and molten nitrate salts, the present analysis compares the two main technologies, without thermal energy storage to evaluate both under similar design conditions. Storage analysis: thermal energy storage increases the value of electricity produced and the plant capacity factor for both technologies (steam and molten nitrate salts). For this reason, the analysis shows for each optimized solar field and receiver thermal power, the optimum combination of turbine power and thermal energy storage that minimizes the levelized electricity cost, for both technologies. Component's cost analysis: market trends are focused on the specific cost reduction by means of larger plant size and through an improved economy of scale. As a result, and based on baseline cost parameters widely accepted in solar industry, an analysis over the specific costs of major components on the electricity cost has been carried out, to lead where the research and development efforts should be made. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:274 / 288
页数:15
相关论文
共 44 条
[1]
Dish Stirling technology: A 100 MW solar power plant using hydrogen for Algeria [J].
Abbas, Mohamed ;
Boumeddane, Bousaad ;
Said, Noureddine ;
Chikouche, Ahmed .
INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2011, 36 (07) :4305-4314
[2]
AICIA, 2002, CIEMAT SOLUCAR CENTR
[3]
Alternate Utility Team, 1988, DOEAL387412 AL UT TE
[4]
[Anonymous], 1988, 0072882 PAC GAS EL C
[5]
[Anonymous], 2011, SAND20112419
[6]
Arizona Public Service Company, 1988, DOEAL387411 AR PUBL
[7]
Baker AF, 1989, SAND888262 SNL EEUU
[8]
Biencinto M., 2010, COMMUNICATION
[9]
Ernst and Young, 2012, REN EN COUNTR ATTR I
[10]
Comparative system analysis of direct steam generation and synthetic oil parabolic trough power plants with integrated thermal storage [J].
Feldhoff, Jan Fabian ;
Schmitz, Kai ;
Eck, Markus ;
Schnatbaum-Laumann, Lars ;
Laing, Doerte ;
Ortiz-Vives, Francisco ;
Schulte-Fischedick, Jan .
SOLAR ENERGY, 2012, 86 (01) :520-530