Valuation and optimal operation of electric power plants in competitive markets

被引:63
作者
Thompson, M [1 ]
Davison, M
Rasmussen, H
机构
[1] Queens Univ, Sch Business, Kingston, ON K7L 3N6, Canada
[2] Univ Western Ontario, Dept Appl Math, London, ON N6A 5B8, Canada
关键词
natural resources/energy : deregulated electricity markets; finance/asset pricing : pricing power plants as real options; dynamic programming/optimal control : application;
D O I
10.1287/opre.1040.0117
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We present an algorithm for the valuation, and, optimal operation of hydroelectric and thermal power generators in deregulated electricity markets. Real options theory is used to derive nonlinear partial-integro-differential equations (PIDEs) for the valuation and optimal operating strategies of both types of facilities. The equations are designed to incorporate a wide class of spot price models that can exhibit the same time-dependent, mean-reverting dynamics and price spikes as those observed in most electricity markets. Particular attention is paid to the operational characteristics. of real power generators. For thermal power plants, these characteristics include variable start-up times and costs, control response time lags, minimum generating levels, nonlinear output functions, and structural limitations on ramp rates. For hydroelectric units, head effects and environmental constraints are addressed. We illustrate the models with numerical examples of a pump storage facility and a thermal power plant. This PIDE framework can, achieve high levels of computational speed and accuracy while incorporating a wide range of spot price dynamics and operational characteristics.
引用
收藏
页码:546 / 562
页数:17
相关论文
共 22 条
[1]  
Clewlow L., 1999, MULTIFACTOR MODEL EN
[2]   Development of a hybrid model for electrical power spot prices [J].
Davison, M ;
Anderson, CL ;
Marcus, B ;
Anderson, K .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (02) :257-264
[3]  
DENG S, 1999, THESIS U CALIFORNIA
[4]  
Ethier RG, 1999, THESIS CORNELL U ITH
[5]  
Gardner D., 2000, ALGORITHMIC RES Q, V3, P9
[6]  
Hobbs B. F., 2001, INT SERIES OPERATION
[7]  
ksendal B., 1998, Stochastic Differential Equations: An Introduction with Applications, V6th, DOI [10.1007/978-3-662-03620-4, DOI 10.1007/978-3-662-03620-4]
[8]  
LeVeque R. J., 1992, NUMERICAL METHODS CO
[9]   Mixed-integer programming applied to short-term planning of a hydro-thermal system [J].
Nilsson, O ;
Sjelvgren, D .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) :281-286
[10]   Integer modelling of spinning reserve requirements in short term scheduling of hydro systems [J].
Nilsson, O ;
Soder, L ;
Sjelvgren, D .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (03) :959-964