The effect of "front-loading" problem-solving on product development performance

被引:180
作者
Thomke, S
Fujimoto, T [1 ]
机构
[1] Univ Tokyo, Fac Econ, Tokyo 113, Japan
[2] Harvard Univ, Sch Business, Boston, MA 02163 USA
关键词
D O I
10.1111/1540-5885.1720128
中图分类号
F [经济];
学科分类号
02 ;
摘要
In recent years, there has been a growing interest in the link between problem-solving capabilities and product development performance. In this article, the authors apply a problem-solving perspective to the management of product development and suggest how shifting the identification mid solving of problems-a concept that they define as front-loading-can reduce development time and cost and thus free up resources to be more innovative in the marketplace. The authors develop a framework of front-loading problem-solving and present related examples and case evidence front development practice. These examples include Boeing's and Chrysler's experience with the use of "digital mock-ups" to identify interference problems that are very costly to solve if identified further dol downstream-sometimes as late as during or-after first frill-scale assembly. lit the article, the authors propose that front-loading cart he achieved using a number of different approaches, two of which are discussed iii detail: (I) project-to-project knowledge transfer-leverage previous projects by transferring problem and solution-specific information to new projects; and (2) rapid problem-solving-leverage advanced technologies and methods to increase the overall rate at which development problems are identified and solved. Methods for improving project-to-project knowledge transfer include the effective use of "post-mortems," which are records of post-project learning and thus carl be instrumental in carrying forward the knowledge front current and past projects. As the article suggests, rapid problem-solving carl be achieved by optimally combining new technologies (such as computer simulation) that allow for faster problem-solving cycles with traditional technologies (such as late stage prototypes), which usually provide higher-fidelity. A field study of front-looking at Toyota Motor Corporation shows how ct systematic effort to front-load its development process has, iii effect, shifted problem-identification and problem-solving to earlier stages of product development. They conclude the at-tide with a discussion of other approaches to front-load problem-solving in product development and propose how a problem-solving perspective cart help managers to build capabilities for higher development performance. (C) 2000 Elsevier Science Inc.
引用
收藏
页码:128 / 142
页数:15
相关论文
共 46 条
[2]  
[Anonymous], 1992, ENG IS HUMAN
[3]  
[Anonymous], ORG SCI
[4]  
[Anonymous], 1998, THINKING LEAN MULTIP
[5]  
AOSHIMA Y, 1996, THESIS MIT
[6]  
ARGYRIS C, 1982, REASONING LEARNING A
[7]  
Boehm B. W., 1981, SOFTWARE ENG EC
[8]  
BROOKS FP, 1982, MYTHICAL MAN MONTH
[9]   PRODUCT DEVELOPMENT - PAST RESEARCH, PRESENT FINDINGS, AND FUTURE-DIRECTIONS [J].
BROWN, SL ;
EISENHARDT, KM .
ACADEMY OF MANAGEMENT REVIEW, 1995, 20 (02) :343-378
[10]  
Clark K.B., 1989, J ENG TECHNOL MANAGE, V6, P25, DOI [https://doi.org/10.1016/0923-4748(89)90013-1, DOI 10.1016/0923-4748(89)90013-1]