Developments in delay time analysis for modelling plant maintenance

被引:104
作者
Christer, AH [1 ]
机构
[1] Univ Salford, Ctr OR & Appl Stat, Salford M5 4WT, Lancs, England
[2] Eindhoven Univ Technol, Fac Technol Management, NL-5600 MB Eindhoven, Netherlands
关键词
delay time concept; maintenance; reliability; engineering; production;
D O I
10.1057/palgrave.jors.2600837
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Delay time (DT) analysis is a pragmatic mathematical concept readily embraced by engineers which has been developed as a means to model maintenance decision problems. Attention is focused upon the maintenance engineering decisions of what to do, as opposed to the logistical decisions of how to do it. This paper reviews the cumulative knowledge and experience of delay time modelling. The decision environment within which delay time (DT) models are intended as decision aids is briefly reviewed, and the initial development of simple DT models for a repairable component and a complex plant presented. Variations on the basic model are outlined and discussed including perfect and non-perfect inspection, steady state and non-steady state conditions, and homogeneous and non-homogeneous Poisson arrival rate of defects. Attention is given to the parameter estimation process, and both subjective and objective estimation techniques are outlined. Case sketches present practical experience in using the DT concept to model actual plant, to assess the benefits obtained and to validate modelling and parameter assessment.
引用
收藏
页码:1120 / 1137
页数:18
相关论文
共 75 条
  • [1] AGHJAGAN HN, 1989, P CAN MAINT ENG C TO
  • [2] [Anonymous], PRODN INV MGMT J
  • [3] ARMITAGE W, 1968, MAINTENANCE EFFECTIV, P196
  • [4] Ascher H., 1984, REPAIRABLE SYSTEMS R
  • [5] Ascher H. E., 1995, IMA Journal of Mathematics Applied in Business and Industry, V6, P85, DOI 10.1093/imaman/6.1.85
  • [6] Baker R. D., 1998, IMA Journal of Mathematics Applied in Business and Industry, V9, P305, DOI 10.1093/imaman/9.4.305
  • [7] Baker R. D., 1997, IMA Journal of Mathematics Applied in Business and Industry, V8, P83, DOI 10.1093/imaman/8.1.83
  • [8] Baker R. D., 1995, IMA Journal of Mathematics Applied in Business and Industry, V6, P3, DOI 10.1093/imaman/6.1.3
  • [9] Baker R.D., 1991, IMA J. Manag. Math, V3, P259, DOI DOI 10.1093/IMAMAN/3.4.259
  • [10] REVIEW OF DELAY-TIME OR MODELING OF ENGINEERING ASPECTS OF MAINTENANCE
    BAKER, RD
    CHRISTER, AH
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 73 (03) : 407 - 422