Taxonomy for change causes and effects in construction projects

被引:198
作者
Sun, Ming [1 ]
Meng, Xianhai [2 ]
机构
[1] Univ W England, Sch Built & Nat Environm, Bristol BS16 1QY, Avon, England
[2] Queens Univ Belfast, Sch Planning Architecture & Civil Engn, Belfast BT9 5AG, Antrim, North Ireland
关键词
Taxonomy; Change cause; Change effect; Delay; Cost overrun; CHANGE ORDERS; LABOR EFFICIENCY; IMPACT; REWORK; PRODUCTIVITY; BENCHMARKING; OVERTIME; DESIGN; COSTS;
D O I
10.1016/j.ijproman.2008.10.005
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
During many construction projects frequent changes often result in time delays, cost overruns, quality defects and other negative impacts. In recent years, many researchers worldwide investigated the effects of project change and more importantly the common causes behind the changes from different perspectives. A large number of research papers have been published in this field. While most existing papers presented valuable empirical work, very few offered a comprehensive and systematic over-view. There is also a certain degree of confusion in the terminology used by different authors. The objective of this paper is to fill this knowledge gap by: (1) reviewing and synthesising existing literature on project change causes and effects; (2) developing two taxonomies for change causes and change effects; and (3) illustrating how the taxonomies can be used during the project change management process. (C) 2008 Elsevier Ltd and IPMA. All rights reserved.
引用
收藏
页码:560 / 572
页数:13
相关论文
共 52 条
[1]  
Aibinu A.A., 2002, INT J PROJ MANAG, V20, P593, DOI [DOI 10.1016/S0263-7863(02)00028-5, 10.1016/S0263-7863, DOI 10.1016/S0263-7863]
[2]   Factors affecting contractors' risk of cost overburden [J].
Akinci, B ;
Fischer, M .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (01) :67-76
[3]  
Akinsola A.O., 1997, INT J PROJ MANAG, V15, P263, DOI [DOI 10.1016/S0263-7863(96)00081-6, 10.1016/S0263-786300081-6, DOI 10.1016/S0263-786300081-6]
[4]  
Al-Khalil M.I., 1999, International Journal of Project Management, V17, P101, DOI 10.1016/S0263-7863(98)00020-9
[5]  
Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51
[6]  
Al-Sedairy S.T., 2001, INT J PROJ MANAG, V19, P161
[7]   Navigational Measures for Managing Defective Designs [J].
Andi .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2005, 21 (01) :10-16
[8]   The potential effects of variation orders on institutional building projects [J].
Arain, Faisal ;
Pheng, Low .
FACILITIES, 2005, 23 (11-12) :496-+
[9]  
ARDITI D, 1985, PROJECT MANAGE, V31, P218
[10]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357