Operation of the JET Active Gas Handling System during and after DTE1

被引:11
作者
Lässer, R [1 ]
Bell, AC
Bainbridge, N
Brennan, D
Grieveson, B
Hemmerich, JL
Jones, G
Kennedy, D
Knipe, S
Lupo, J
Mart, J
Perevezentsev, A
Skinner, N
Stagg, R
Yorkshades, J
Atkins, GV
Dörr, L
Green, N
Stead, M
Wilson, K
机构
[1] Jet Joint Undertaking, Abingdon OX14 3EA, Oxon, England
[2] Forschungszentrum Karlsruhe, D-76021 Karlsruhe, Germany
关键词
JET Active Gas Handling System; fusion;
D O I
10.1016/S0920-3796(99)00023-X
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
During and after the Deuterium-Tritium Experiment (DTE1) the JET Active Gas Handling System fulfilled all expectations and requirements: it pumped, processed and purified the gases from the Torus and connected systems, isotopically separated hydrogen and supplied 100 g tritium to the machine with only 20 g on JET site which means that the tritium was recycled five times. In addition, it supplied ventilation air detritiation services during interventions inside and outside the Active Gas Handling building. This demonstrated for the first time that high tritium quantities can be recycled safely in connection with a large fusion facility. The paper describes the operation of the Active Gas Handling System. (C) 1999 JET Joint Undertaking. Published by Elsevier Science S.A. All rights reserved.
引用
收藏
页码:307 / 312
页数:6
相关论文
共 4 条
[1]  
BRENNAN D, 1998, P 20 S FUS TECHN SOF, P997
[2]  
HEMMERICH JL, 1993, P 15 IEEE NPSS S FUS, P37
[3]  
LASSER R, 1998, P 20 S FUS TECHN SOF, P1005
[4]  
LASSER R, 1996, P 19 SOFT LISB PORT, V1, P227