Chance-Constrained Day-Ahead Scheduling in Stochastic Power System Operation

被引:269
作者
Wu, Hongyu [1 ]
Shahidehpour, Mohammad [1 ]
Li, Zuyi [1 ]
Tian, Wei [1 ]
机构
[1] IIT, Chicago, IL 60616 USA
关键词
Chance constraints; day-ahead scheduling; hourly load forecast errors; random outages of components; stochastic hourly unit commitment; variable renewable sources; UNIT COMMITMENT; WIND POWER; GENERATION; SCUC; DISPATCH; IMPACT; ERROR;
D O I
10.1109/TPWRS.2013.2296438
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
This paper proposes a day-ahead stochastic scheduling model in electricity markets. The model considers hourly forecast errors of system loads and variable renewable sources as well as random outages of power system components. A chance-constrained stochastic programming formulation with economic and reliability metrics is presented for the day-ahead scheduling. Reserve requirements and line flow limits are formulated as chance constraints in which power system reliability requirements are to be satisfied with a presumed level of high probability. The chance-constrained stochastic programming formulation is converted into a linear deterministic problem and a decomposition-based method is utilized to solve the day-ahead scheduling problem. Numerical tests are performed and the results are analyzed for a modified 31-bus system and an IEEE 118-bus system. The results show the viability of the proposed formulation for the day-ahead stochastic scheduling. Comparative evaluations of the proposed chance-constrained method and the Monte Carlo simulation (MCS) method are presented in the paper.
引用
收藏
页码:1583 / 1591
页数:9
相关论文
共 36 条
[1]
[Anonymous], 2013, Power generation, operation, and control
[2]
[Anonymous], 2013, Stochastic Programming
[3]
Statistical analysis of wind power forecast error [J].
Bludszuweit, Hans ;
Antonio Dominguez-Navarro, Jose ;
Llombart, Andres .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (03) :983-991
[4]
Bo Rong, 2009, P 2008 CHIN URB PLAN, P1
[5]
California ISO, INT REN RES TECHN AP
[6]
Conejo A.J., 2012, Decision Making under Uncertainty in Electricity Market
[7]
Scenario reduction in stochastic programming -: An approach using probability metrics [J].
Dupacová, J ;
Gröwe-Kuska, N ;
Römisch, W .
MATHEMATICAL PROGRAMMING, 2003, 95 (03) :493-511
[8]
Load shedding: A new proposal [J].
Faranda, Roberto ;
Pievatolo, Antonio ;
Tironi, Enrico .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :2086-2093
[9]
AC contingency dispatch based on security-constrained unit commitment [J].
Fu, Y ;
Shahidehpour, M ;
Li, ZY .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (02) :897-908
[10]
Henrion Rene., 2004, Introduction to Chance Constrained Optimization