An integrated dynamic performance measurement system for improving manufacturing competitiveness

被引:163
作者
Ghalayini, AM [1 ]
Noble, JS [1 ]
Crowe, TJ [1 ]
机构
[1] UNIV MISSOURI,DEPT IND ENGN,COLUMBIA,MO 65211
关键词
performance measurement; integration; traditional; production operations;
D O I
10.1016/S0925-5273(96)00093-X
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Until the 1980s manufacturing companies relied solely on performance measurement systems based on traditional cost accounting systems to control, monitor, and improve their operations. However, it has been shown that these systems do not capture the relevant performance issues for today's manufacturing environment. Rather, they focus on monitoring and controlling versus supporting process improvement, promoting overall system optimization, and addressing the dynamics of changing systems. In order to overcome the limitations of the traditional performance measurement systems a variety of integrated systems have been proposed. However, these systems have not yet fully addressed the requirements of a performance measurement system for today's manufacturing environment. This paper presents an integrated dynamic performance measurement system (IDPMS) developed in conjunction with the Missouri Plant of Square D Company. The IDPMS integrates three main areas of the company: management, process improvement team, and factory shop floor. To achieve an integrated system, the three areas are linked through the specification, reporting and dynamic updating of the defined areas of success, performance measures, and performance standards. Three tools are incorporated to support and enhance the integration within the IDPMS. An example is given that illustrates how the IDPMS addresses the current requirements of a performance measurement system.
引用
收藏
页码:207 / 225
页数:19
相关论文
共 21 条
[1]  
[Anonymous], BOTTOM LINE MEASURIN
[2]  
[Anonymous], 1991, MANAGING NEW WORLD M
[3]  
[Anonymous], P 3 IND ENG RES C AT
[4]  
CROSS KF, 1988, NATL PRODUCTIVITY RE, V8, P23
[5]  
Dixon J.R., 1990, NEW PERFORMANCE CHAL
[6]  
DRUCKER PF, 1990, HARVARD BUS REV, V68, P94
[7]  
ECCLES RG, 1991, HARVARD BUS REV, V69, P131
[8]  
Fisher J., 1992, J COST MANAGEMENT, V6, P31
[9]   INTEGRATED PERFORMANCE-MEASUREMENT - A REVIEW OF CURRENT PRACTICE AND EMERGING TRENDS [J].
GREGORY, MJ .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 30-1 :281-296
[10]  
Hayes R.H., 1988, DYNAMIC MANUFACTURIN