Heuristic methods for wind energy conversion system positioning

被引:125
作者
Ozturk, UA
Norman, BA
机构
[1] Univ Pittsburgh, Dept Ind Engn, Pittsburgh, PA 15261 USA
[2] Hawaii Pacific Univ, Coll Business Adm, Honolulu, HI 96813 USA
关键词
wind farm; heuristic optimization; power generation;
D O I
10.1016/j.epsr.2003.12.006
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper considers the problem of determining the locations of wind generators in a wind farm consisting of many generators. The objective is to find a generator placement that maximizes profit, which is the product of the cost efficiency of the generators and the total power output from the wind farm. Generator placement is significant because if generator A is located close to generator B and is located downwind of generator B then the power output of generator A is reduced by an amount that varies with the distance between the generators. The problem can be formulated using mathematical programming but to solve the problem one cannot employ traditional optimization methods. Therefore, a greedy improvement heuristic methodology is developed and described in detail. The effectiveness of the proposed heuristic is demonstrated on a suite of test problems. These results indicate that the proposed method represents an effective solution strategy for this problem. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:179 / 185
页数:7
相关论文
共 5 条
[1]   Some personal views on the current state and the future of Locational Analysis [J].
Avella, P ;
Benati, S ;
Martinez, LC ;
Dalby, K ;
Di Girolamo, D ;
Dimitrijevic, B ;
Ghiani, G ;
Giannikos, I ;
Guttmann, N ;
Hultberg, TH ;
Fliege, J ;
Marin, A ;
Marquez, MM ;
Ndiaye, MM ;
Nickel, S ;
Peeters, P ;
Brito, DP ;
Policastro, S ;
de Gama, FAS ;
Zidda, P .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 104 (02) :269-287
[2]   ANALYTICAL MODELS FOR LOCATING UNDESIRABLE FACILITIES [J].
ERKUT, E ;
NEUMAN, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 40 (03) :275-291
[3]   OPTIMIZATION OF WIND TURBINE POSITIONING IN LARGE WINDFARMS BY MEANS OF A GENETIC ALGORITHM [J].
MOSETTI, G ;
POLONI, C ;
DIVIACCO, B .
JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 1994, 51 (01) :105-116
[4]   Strategic facility location: A review [J].
Owen, SH ;
Daskin, MS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 111 (03) :423-447
[5]  
PATEL MR, 1999, WIND SOLAR POWER SYS, P85