Evaluating the effectiveness of mixed-integer linear programming for day-ahead hydro-thermal self-scheduling considering price uncertainty and forced outage rate

被引:24
作者
Esmaeily, Ali [1 ]
Ahmadi, Abdollah [2 ]
Raeisi, Fatima [3 ]
Ahmadi, Mohammad Reza [2 ]
Nezhad, Ali Esmaeel [4 ]
Janghorbani, Mohammadreza [5 ]
机构
[1] Islamic Azad Univ, Dept Elect Engn, Karaj Branch, Karaj, Iran
[2] Islamic Azad Univ, Dept Elect Engn, Marvdasht Branch, Marvdasht, Iran
[3] Hormozgan Univ, Dept Management, Bandarabbas, Iran
[4] Islamic Azad Univ, Young Researchers & Elite Club, Shiraz Branch, Shiraz, Iran
[5] Islamic Azad Univ, Dept Elect Engn, Cent Tehran Branch, Tehran, Iran
关键词
Mixed-integer linear programming; Uncertainty; Modeling; Electricity market; Self-scheduling; CONSTRAINED UNIT COMMITMENT; PARTICLE SWARM OPTIMIZATION; BIDDING STRATEGY; DISPATCH PROBLEM; COMBINED HYDRO; JOINT ENERGY; THERMAL UNIT; SECURITY; ALGORITHM; PRODUCER;
D O I
10.1016/j.energy.2017.01.089
中图分类号
O414.1 [热力学];
学科分类号
070201 [理论物理];
摘要
A new optimization framework based on MILP model is introduced in the paper for the problem of stochastic self-scheduling of hydrothermal units known as HISS Problem implemented in a joint energy and reserve electricity market with day-ahead mechanism. The proposed MILP framework includes some practical constraints such as the cost due to valve-loading effect, the limit due to DRR and also multi-POZs, which have been less investigated in electricity market models. For the sake of more accuracy, for hydro generating units' model, multi performance curves are also used. The problem proposed in this paper is formulated using a model on the basis of a stochastic optimization technique while the objective function is maximizing the expected profit utilizing MILP technique. The suggested stochastic self scheduling model employs the price forecast error in order to take into account the uncertainty due to price. Besides, LMCS is combined with roulette wheel mechanism so that the scenarios corresponding to the non-spinning reserve price and spinning reserve price as well as the energy price at each hour of the scheduling are generated. Finally, the IEEE 118-bus power system is used to indicate the performance and the efficiency of the suggested technique. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:182 / 193
页数:12
相关论文
共 55 条
[1]
Optimized Sectionalizing Switch Placement Strategy in Distribution Systems [J].
Abiri-Jahromi, Amir ;
Fotuhi-Firuzabad, Mahmud ;
Parvania, Masood ;
Mosleh, Mohsen .
IEEE TRANSACTIONS ON POWER DELIVERY, 2012, 27 (01) :362-370
[2]
Demand-side reserve in stochastic market clearing of joint energy/reserve auctions [J].
Aghaei, J. ;
Amjady, N. ;
Shayanfar, H. A. .
EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2011, 21 (01) :565-580
[3]
Joint market clearing in a stochastic framework considering power system security [J].
Aghaei, J. ;
Shayanfar, H. A. ;
Amjady, N. .
APPLIED ENERGY, 2009, 86 (09) :1675-1682
[4]
Aghaei J, 2012, ELECTRON ENG, P1
[5]
Aghaei J, 2013, IEEE SYST J, V9, P1
[6]
Mixed integer programming of multiobjective hydro-thermal self scheduling [J].
Ahmadi, A. ;
Aghaei, J. ;
Shayanfar, H. A. ;
Rabiee, A. .
APPLIED SOFT COMPUTING, 2012, 12 (08) :2137-2146
[7]
Ahmadi A, 2011, 19 IR C EL ENG ICEE, P1097
[8]
Comment on 'Reliability constrained unit commitment with combined hydro and thermal generation embedded using self-learning group search optimizer' by JH Zheng, JJ Chen, QH. Wu, and ZX Jing [Energy 81 (2015) 245-254] [J].
Ahmadi, Abdollah ;
Kaymanesh, Amirabbas ;
Heidari, Alireza ;
Agelidis, Vassilios G. .
ENERGY, 2015, 89 :1103-1105
[9]
Evaluating the effectiveness of normal boundary intersection method for short-term environmental/economic hydrothermal self-scheduling [J].
Ahmadi, Abdollah ;
Kaymanesh, Amirabbas ;
Siano, Pierluigi ;
Janghorbani, Mohammadreza ;
Nezhad, Ali Esmaeel ;
Sarno, Debora .
ELECTRIC POWER SYSTEMS RESEARCH, 2015, 123 :192-204
[10]
Stochastic Multiobjective Market Clearing of Joint Energy and Reserves Auctions Ensuring Power System Security [J].
Amjady, Nima ;
Aghaei, Jamshid ;
Shayanfar, Heidar Ali .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (04) :1841-1854