An evaluation of construction time performance in the building industry

被引:112
作者
Chan, DWM
Kumaraswamy, MM
机构
[1] Dept. of Civ. and Struct. Eng., University of Hong Kong, Hong Kong
关键词
Budget control - Buildings - Costs - Evaluation - Mathematical models - Performance - Personnel - Project management - Surveys;
D O I
10.1016/0360-1323(96)00031-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Building industries in many countries have been increasingly recognising the need for more efficient and timely completion of projects. Often, a number of unexpected problems and changes from original design ar ise during the construction phase, leading to cost and time overruns. Therefore, exploring the reasons for delay is one of the prerequisites of keeping the cost within budget and of good construction time performance. The primary objective of this pager is to identify the principal factors responsible for delays in the Hong Kong building industry, and determine their relative importance as perceived by different participant; groups. A questionnaire survey, based on 83 previously identified delay factors, grouped into eight major factor categories, was conducted in early 1995. Responses from 78 construction personnel - from client, consultant and contractor organisations - suggest a strong consistency in perception between clients and consultants, for example as to the importance of the ''poor site management and supervision'' delay factor and the ''contractor-related'' delay factor category. However, there was a substantial disagreement between consultants and contractors, as well as between clients and contractors, in respect of the rankings of both the individual factors and the factor categories. Suggestions are given for more effective project management based on the observations. The results of this survey also provide a foundation for further research towards the development of an envisaged ''construction time'' prediction model for local building projects. Copyright (C) 1996 Elsevier Science Ltd.
引用
收藏
页码:569 / 578
页数:10
相关论文
共 27 条
  • [1] [Anonymous], 1974, Public planning: The inter-corporate dimension
  • [2] [Anonymous], 1983, FAST BUILD IND
  • [3] [Anonymous], CONSTR MANAG EC
  • [4] [Anonymous], FAST BUILD COMM
  • [5] Ashley D. B., 1987, Project Management Journal, V18, P69
  • [6] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [7] BARNES M, 1988, PROJECT MANAGEMENT, V6, P69
  • [8] BROMILOV FJ, 1974, CHARTERED BUILDER, V10
  • [9] Bromilow F. J., 1969, BUILDING FORUM, V1, P70
  • [10] BRYANT DT, 1969, IOR3552 TAV I HUM RE