Using AHP for determining priority in a safety management system

被引:71
作者
Chan, AHS [1 ]
Kwok, W
Duffy, VG
机构
[1] City Univ Hong Kong, Dept Mfg Engn & Engn Management, Hong Kong, Hong Kong, Peoples R China
[2] Mississippi State Univ, Dept Ind Engn, Mississippi State, MS USA
关键词
safety measures; health and safety; analytical hierarchy process; construction industry; Hong Kong;
D O I
10.1108/02635570410537516
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The analytic hierarchy process (AHP) method was used to determine the priority of processes outlined in the BS8800 Guide to Occupational Health and Safety Management Systems for the Hong Kong construction industry. Analysis of variance was used to further investigate the differences among three different kinds of construction enterprises: joint venture (JV), well-established (W-E) and small and medium sized (SME) enterprises. This study of 32 construction enterprises suggests that JV and W-E enterprises are able to demonstrate stronger commitment to strategic safety issues whereas SMEs focus more on the short-term safety issues in implementation of safety management system. The results also indicate that "Safety Training" may be a problem area in all three groups. When considering differences shown between groups, these rankings can be used as a guide for the practical implementation of the British Standard BS8800 Safety Management System in construction enterprises in Hong Kong.
引用
收藏
页码:430 / 445
页数:16
相关论文
共 29 条
[1]  
[Anonymous], WORLD COMP YB 1996
[2]  
*BSI, 1996, BS8800 BSI
[3]  
*CENS STAT DEP, 1998, HONG KONG YB
[4]  
Culley W. C., 1996, PROF SAF, V41, P20
[5]  
DIAS LMA, 1996, IMPLEMENTATION SAFET
[6]  
*ENV TRANSP WORKS, 2002, 302002 ENV TRANSP WO
[7]  
Golden BL., 1989, ANAL HIERARCHY PROCE, DOI [10.1007/978-3-642-50244-6, DOI 10.1007/978-3-642-50244-6]
[8]  
GRIFFITH A, 1994, ENV MANAGEMENT SYSTE
[9]  
*HLTH SAF EX, 1993, HSG65 HLTH SAF EX
[10]  
*HONG KONG GOV, 1998, HONG KONG ANN DIG ST