A two-phase GA model for resource-constrained project scheduling

被引:92
作者
Chen, Po-Han [1 ]
Weng, Haijie [1 ]
机构
[1] Nanyang Technol Univ, Sch Civil & Environm Engn, Singapore 639798, Singapore
关键词
Resource-constrained project scheduling; Genetic algorithm (GA); Time-cost trade-off; Resource scheduling; GENETIC ALGORITHMS; CONSTRUCTION; NETWORKS;
D O I
10.1016/j.autcon.2008.11.003
中图分类号
TU [建筑科学];
学科分类号
081407 [建筑环境与能源工程];
摘要
In construction scheduling, problems can arise when each activity could start at different time points and the resources needed by the activities are limited. Moreover. activities have required conditions to be met, such as precedence relationships, resource requirements, etc. To resolve these problems. a two-phase GA (genetic algorithm) model is proposed in this paper, in which both the effects of time-cost trade-off and resource scheduling are taken into account. A GA-based time-cost trade-off analysis is adopted to select the execution mode of each activity through the balance of time and cost, followed by utilization of a GA-based resource scheduling method to generate a feasible schedule which may satisfy all the project constraints. Finally, the model is demonstrated using an example project and a real project. (c) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:485 / 498
页数:14
相关论文
共 21 条
[1]
Scheduling cost optimization and neural dynamics model for construction [J].
Adeli, H ;
Karim, A .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (04) :450-458
[2]
[Anonymous], PROJECT ENG COMPUTER
[3]
[Anonymous], 1991, Handbook of genetic algorithms
[4]
Burns S.A., 1996, CONSTR MANAG ECON, V14, P265, DOI [10.1080/014461996373511, DOI 10.1080/014461996373511]
[5]
Butcher W., 1967, Journal of the Construction Division Proceedings of the American Society of Civil Engineers, V93, P59
[6]
Construction resource scheduling with genetic algorithms [J].
Chan, WT ;
Chua, DKH ;
Kannan, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02) :125-132
[7]
Davis E. W., 1971, Management Science, V17, P803, DOI 10.1287/mnsc.17.12.B803
[9]
Using genetic algorithms to solve construction time-cost trade-off problems [J].
Feng, CW ;
Liu, LA ;
Burns, SA .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) :184-189
[10]
Fondahl JW, 1961, 9 STANF U CONSTR I D