Bottleneck management: theory and practice

被引:24
作者
Chakravorty, S. S.
Atwater, J. Brian
机构
[1] Kennesaw State Coll, Michael J Coles Coll Business, Dept Management & Entrepreneurship, Kennesaw, GA 30144 USA
[2] Utah State Univ, Coll Business, Dept Business Adm, Logan, UT 84322 USA
关键词
bottleneck management; theory of constraints; case study;
D O I
10.1080/09537280600682752
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Advocates of TOC believe that bottleneck resource restricts an operation's ability to make money, and the best way to maximise income is to fully exploit the bottleneck resource. Almost all TOC literature focuses on situations where 100% bottleneck utilisation is applied. Based on the implementation experience, the finding is that the optimal level of bottleneck utilisation should be less than 100% and any attempt to increase utilisation beyond the optimal level brings disastrous results for a door manufacturing plant. In order to improve and maintain the performance of the plant effective bottleneck management is critical. The experience provides a deeper understanding of how to design such plants, which could be beneficial for practising managers and academics working with TOC concepts.
引用
收藏
页码:441 / 447
页数:7
相关论文
共 17 条
[1]  
Atwater JB, 2002, PROD OPER MANAG, V11, P259, DOI 10.1111/j.1937-5956.2002.tb00495.x
[2]  
Chakravorty S. S., 1996, Simulation & Gaming, V27, P223, DOI 10.1177/1046878196272006
[3]  
Chakravorty SS., 2000, Production and Inventory Management Journal, V41, P37
[4]  
Christensen CM, 2003, HARVARD BUS REV, V81, P66
[5]  
Dillon AP, 1985, A Revolution in Manufacturing: The SMED System, DOI DOI 10.4324/9781315136479
[6]  
FONTANA A, 2000, HDB QUALITATIVE RES, P567
[7]  
Goldratt E.M., 1992, GOAL, V2nd
[8]  
Goldratt E.M., 1990, THEORY CONSTRAINTS
[9]  
Hopp W.J., 1996, FACTORY PHYS
[10]   KANBAN, MRP, AND SHAPING THE MANUFACTURING ENVIRONMENT [J].
KRAJEWSKI, LJ ;
KING, BE ;
RITZMAN, LP ;
WONG, DS .
MANAGEMENT SCIENCE, 1987, 33 (01) :39-57