Throughput in serial lines with state-dependent behavior

被引:33
作者
Powell, SG [1 ]
Schultz, KL
机构
[1] Dartmouth Coll, Amos Tuck Sch Business Adm, Hanover, NH 03755 USA
[2] Cornell Univ, Johnson Grad Sch Management, Ithaca, NY 14853 USA
关键词
serial production lines; state-dependent behavior; just-in-time; laboratory experiments; buffer capacity;
D O I
10.1287/mnsc.1040.0233
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Experimental evidence suggests that production-line workers adjust their work rates in certain situations to prevent idle time. We refer to this as state-dependent behavior, in contrast to the state-independent behavior of machines. In this paper, we develop several models for the state-dependent behavior of production workers. We then use these models to analyze the relation of line length to throughput in these systems. We find that state-dependent behavior makes serial lines more efficient and reduces the detrimental effects that longer line lengths have on throughput. In some cases, line efficiency can actually increase with length. This is a result of a higher percentage of workers having two buffers to provide feedback on the state of the line. Further, we show that workers who both speed up when they are likely to cause idle time for others and slow down when they are likely to become idle themselves improve the overall efficiency of the line.
引用
收藏
页码:1095 / 1105
页数:11
相关论文
共 23 条
[1]   MOTIVATIONAL DETERMINANTS OF RISK-TAKING BEHAVIOR [J].
ATKINSON, JW .
PSYCHOLOGICAL REVIEW, 1957, 64 (06) :359-372
[2]   SELF SYSTEM IN RECIPROCAL DETERMINISM [J].
BANDURA, A .
AMERICAN PSYCHOLOGIST, 1978, 33 (04) :344-358
[3]   A SIMPLE FORMULA FOR ESTIMATING THROUGHPUT OF SERIAL PRODUCTION LINES WITH VARIABLE PROCESSING TIMES AND LIMITED BUFFER CAPACITY [J].
BLUMENFELD, DE .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (06) :1163-1182
[4]   THE ROLE OF WORK-IN-PROCESS INVENTORY IN SERIAL PRODUCTION LINES [J].
CONWAY, R ;
MAXWELL, W ;
MCCLAIN, JO ;
THOMAS, LJ .
OPERATIONS RESEARCH, 1988, 36 (02) :229-241
[5]  
Doerr KH, 1996, J APPL PSYCHOL, V81, P142
[6]  
EARLEY PC, 1990, UNPUB TIME DEPENDENC
[7]  
EDIE LC, 1954, OPER RES, V2, P107
[8]  
FRANKS IT, 1966, INT J PROD RES, V5, P97
[9]   THE OUTPUT PROCESSES OF SERIAL PRODUCTION LINES OF GENERAL MACHINES WITH FINITE BUFFERS [J].
HENDRICKS, KB ;
MCCLAIN, JO .
MANAGEMENT SCIENCE, 1993, 39 (10) :1194-1201
[10]  
HILLIER FS, 1966, J IND ENGINEERING, V17, P651