Automated generation of work spaces required by construction activities

被引:121
作者
Akinci, B [1 ]
Fischer, M
Kunz, J
机构
[1] Carnegie Mellon Univ, Dept Civil & Environm Engn, Pittsburgh, PA 15213 USA
[2] Stanford Univ, Dept Civil & Environm Engn, Stanford, CA 94305 USA
[3] Stanford Univ, Ctr Integrated Facil Engn, Stanford, CA 94305 USA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2002年 / 128卷 / 04期
关键词
workspace; project management; construction methods; scheduling;
D O I
10.1061/(ASCE)0733-9364(2002)128:4(306)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To provide a safe and productive environment, project managers need to plan for the work spaces required by construction activities. Work space planning involves representing various types of spaces required by construction activities in three dimensions and across time. Since a construction schedule consists of hundreds of activities requiring multiple types of spaces, it is practically impossible to expect project managers to specify manually the spatiotemporal data necessary to represent work spaces in four dimensions. This paper presents mechanisms that automatically generate project-specific work spaces from a generic work space ontology and a project-specific IFC (industry foundation class) based 4D production model. The generation of these work spaces leads to a space-loaded production model. Within this model, work spaces are represented as being related to the relevant construction activities and methods and as having attributes that describe when, where, and how long they exist, and how much volume they occupy. These space-loaded production models enable richer 4D CAD simulations, time-space conflict analysis, and proactive work space planning prior to construction.
引用
收藏
页码:306 / 315
页数:10
相关论文
共 32 条
  • [1] AALAMI F, 1998, THESIS STANFORD U ST
  • [2] AKINCI B, 2000, THESIS STANFORD U ST
  • [3] ALSHAWI M, 1997, SPACE INTEGRATED ENV
  • [4] BALLARD G, 1997, LAST PLANNER
  • [5] *BENTL SYST, 2001, BENTL SCHED SIM REL
  • [6] Choi BJ, 1996, COMPUTING IN CIVIL ENGINEERING, P711
  • [7] WorkPlan: Constraint-based database for work package scheduling
    Choo, HJ
    Tommelein, ID
    Ballard, G
    Zabelle, TR
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (03) : 151 - 160
  • [8] Claus B., 1998, Spatial Cognition. An Interdisciplinary Approach to Representing and Processing Spatial Knowledge, P241
  • [9] COLLIER E, 1995, 101 STANF U CTR INT
  • [10] Eastman C. M., 1975, SPATIAL SYNTHESIS CO