Optimal design of system reliability using interval programming and genetic algorithms

被引:28
作者
Gen, M
Cheng, RW
机构
[1] Dept. of Indust. and Syst. Eng., Ashikaga Institute of Technology
关键词
reliability optimization; interval programming; bicriteria programming; and genetic algorithm;
D O I
10.1016/0360-8352(96)00120-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we examine the optimal design problem of system reliability with uncertain coefficients and formulate it as an interval programming model. Genetic algorithms are applied to the problem. The basic idea of the proposed method is first to transform the interval programming model into an equivalent bicriteria programming model and then to find the Pareto solutions of the bicriteria programming problem using genetic algorithms. Numerical examples are given to demonstrate the efficiency of the proposed approach.
引用
收藏
页码:237 / 240
页数:4
相关论文
共 7 条
[1]   SYSTEM RELIABILITY ALLOCATION AND A COMPUTATIONAL ALGORITHM [J].
FYFFE, DE ;
HINES, WW ;
LEE, NK .
IEEE TRANSACTIONS ON RELIABILITY, 1968, R 17 (02) :64-&
[2]  
GEN M, 1995, ISE946 ASH I TECHN
[3]  
Gen M, 1996, GENETIC ALGORITHMS E
[4]  
GEN M, 1996, P 6 INT S ROB MAN MO
[5]  
Hansen Eldon R., 1992, Global optimization using interval analysis
[6]  
Ishbuchi H, 1989, J JAPAN IND MANAGEME, V40, P320, DOI DOI 10.11221/JIMAPRE.40.5_320
[7]   MULTIOBJECTIVE PROGRAMMING IN OPTIMIZATION OF THE INTERVAL OBJECTIVE FUNCTION [J].
ISHIBUCHI, H ;
TANAKA, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 48 (02) :219-225