Forming relationships with stakeholders in engineering projects

被引:28
作者
Karlsen, Jan Terje [1 ]
机构
[1] Norwegian Sch Management BI, N-0442 Oslo, Norway
关键词
project management; relationships; stakeholders; engineering projects; case studies;
D O I
10.1504/EJIE.2008.016328
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For a project manager, it is vital to build good relations with the stakeholders who are identified as being most crucial in the project process and in using the final results of the project. The purpose of this paper is to study relationships in an engineering project setting; more specifically, the focus is on identifying the determining factors that form the relationship between the project and its stakeholders. This paper presents an empirical study based on in-depth interviews following a semistructured approach. Three engineering projects were studied in detail. Results from the current study identified five different types of relationships: classical market; through a third party; open and direct; integrated team; and partnering. Another finding indicates that five different factors have an impact on the formation of the project-stakeholder relationship: trust; uncertainty and control; culture and language; resources and knowledge; and goal congruence.
引用
收藏
页码:35 / 49
页数:15
相关论文
共 35 条
[1]  
[Anonymous], CONSTR INF Q
[2]  
[Anonymous], 1989, IND RECIPES INQUIRY
[3]  
Baiden B. K., 2006, International Journal of Project Management, V24, P13, DOI 10.1016/j.ijproman.2005.05.001
[4]  
BRAENDSHOI H, 2001, STAKEHOLDER ANAL INT
[5]  
BURGOYNE JG, 1999, QUALITATIVE METHODS
[6]  
CHAN A, 1996, P CIB BEIJ INT C BEI
[7]  
Cleland D. I., 1986, Project Management Journal, V17, P36
[8]   Beyond stakeholder satisfaction: aiming for a new frontier of sustainable stakeholder trust [J].
Dervitsiotis, KN .
TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2003, 14 (05) :511-524
[9]  
Eden C.Ackermann., 1998, MAKING STRATEGY JOUR
[10]  
Ford D., 2011, Managing Business Relationships