Design of flexible assembly line to minimize equipment cost

被引:102
作者
Bukchin, J [1 ]
Tzur, M [1 ]
机构
[1] Tel Aviv Univ, Fac Engn, Dept Ind Engn, IL-69978 Tel Aviv, Israel
关键词
D O I
10.1080/07408170008967418
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we develop an optimal and a heuristic algorithm for the problem of designing a flexible assembly line when several equipment alternatives are available. The design problem addresses the questions of selecting the equipment and assigning tasks to workstations, when precedence constraints exist among tasks. The objective is to minimize total equipment costs, given a pre-determined cycle time (derived from the required production rate). We develop an exact branch and bound algorithm which is capable of solving practical problems of moderate size. The algorithm's efficiency is enhanced due to the development of good lower bounds, as well as the use of some dominance rules to reduce the size of the branch and bound tree. We also suggest the use of a branch-and-bound-based heuristic procedure for large problems, and analyze the design and performance of this heuristic.
引用
收藏
页码:585 / 598
页数:14
相关论文
共 13 条
[1]  
[Anonymous], 1988, INT J FLEX MANUF SYS, DOI DOI 10.1007/BF00713158
[2]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[3]   A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[4]  
Graves S. C., 1979, Proceedings of the 18th IEEE Conference on Decision and Control Including the Symposium on Adaptive Processes, P531
[5]   AN INTEGER PROGRAMMING PROCEDURE FOR ASSEMBLY SYSTEM-DESIGN PROBLEMS [J].
GRAVES, SC ;
LAMAR, BW .
OPERATIONS RESEARCH, 1983, 31 (03) :522-545
[6]   OPTIMALLY BALANCING LARGE ASSEMBLY LINES WITH FABLE [J].
JOHNSON, RV .
MANAGEMENT SCIENCE, 1988, 34 (02) :240-253
[7]  
KARP R. M., 1972, COMPLEXITY COMPUTER, P85, DOI DOI 10.1007/978-1-4684-2001-2_9
[8]  
Mansoor Ezekiel Meir, 1971, DEV OPERATIONS RES, P361
[9]   ASSEMBLY LINE BALANCING WITH PROCESSING ALTERNATIVES - AN APPLICATION [J].
PINTO, PA ;
DANNENBRING, DG ;
KHUMAWALA, BM .
MANAGEMENT SCIENCE, 1983, 29 (07) :817-830
[10]  
Rubinovitz J., 1993, ANN CIRP, V42, P497, DOI DOI 10.1016/S0007-8506(07)62494-9