Simulation as a tool for pile productivity assessment

被引:16
作者
Zayed, TM
Halpin, DW
机构
[1] Zagazig Univ, Fac Engn, Construct Engn & Management Dept, Zagazig, Egypt
[2] Purdue Univ, Sch Civil Engn, W Lafayette, IN 47907 USA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2004年 / 130卷 / 03期
关键词
piles construction; productivity; models; simulation; decision making; costs;
D O I
10.1061/(ASCE)0733-9364(2004)130:3(394)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Subsurface obstacles, lack of contractor experience, site planning in addition to other factors complicated the installation process of pile foundation. Productivity and cost estimates for such a process are affected by these difficulties. Therefore this study focuses on the piling process productivity and cost assessment using simulation. Data were collected for this study through designated questionnaires, site interviews, and telephone calls to experts in different construction companies. Many variables have been considered in the piling construction process. Two simulation models have been designed and validated to assess piling process productivity and cost. Consequently, two sets of charts have been developed based upon the validated models to provide the decision-maker with a solid planning, scheduling, and control tool for piling process projects.
引用
收藏
页码:394 / 404
页数:11
相关论文
共 6 条
  • [1] Halpin D. W., 1992, Planning and Analysis of Construction Operations
  • [2] MAHONEY WD, 2000, MEANS CONSTRUCTION C
  • [3] Peurifoy R.L., 1996, CONSTRUCTION PLANNIN
  • [4] REESE LC, 1988, PUBLICATION
  • [5] ZAYED TM, 2001, THESIS PURDUE U W LA
  • [6] ZAYED TM, 2002, 1 INT C CONSTR 21 CE