A robust scheduling method based on a multi-objective immune algorithm

被引:59
作者
Zuo, Xingquan [1 ]
Mo, Hongwei [2 ]
Wu, Jianping [1 ]
机构
[1] Beijing Univ Posts & Telecommun, Comp Sch, Beijing 100876, Peoples R China
[2] Harbin Engn Univ, Automat Sch, Harbin, Peoples R China
基金
中国国家自然科学基金;
关键词
Production scheduling; Workflow model; Immune algorithm; Variable neighborhood; Multi-objective optimization; OPTIMIZATION APPROACH; GENETIC ALGORITHM; SHOP; UNCERTAINTY; HEURISTICS;
D O I
10.1016/j.ins.2009.06.003
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A robust scheduling method is proposed to solve uncertain scheduling problems. An uncertain scheduling problem is modeled by a set of workflow models, and then a scheduling scheme (solution) of the problem can be evaluated by workflow simulations executed with the workflow models in the set. A multi-objective immune algorithm is presented to find Pareto optimal robust scheduling schemes that have good performance for each model in the set. The two optimization objectives for scheduling schemes are the indices of the optimality and robustness of the scheduling results. An antibody represents a resource allocation scheme, and the methods of antibody coding and decoding are designed to deal with resource conflicts during workflow simulations. Experimental tests show that the proposed method can generate a robust scheduling scheme that is insensitive to uncertain scheduling environments. (C) 2009 Elsevier Inc. All rights reserved.
引用
收藏
页码:3359 / 3369
页数:11
相关论文
共 19 条
[1]  
[Anonymous], 1998, SCHEDULING ALGORITHM
[2]   Decomposition heuristics for robust job-shop scheduling [J].
Byeon, ES ;
Wu, SD ;
Storer, RH .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1998, 14 (02) :303-313
[3]   A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling [J].
Chtourou, Hedi ;
Haouari, Mohamed .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 55 (01) :183-194
[4]   Proactive heuristic procedures for robust project scheduling: An experimental analysis [J].
de Vonder, Stijn Van ;
Demeulemeester, Erik ;
Herroelen, Willy .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :723-733
[5]  
Fan Y. S., 2001, WORKFLOW MANAGEMENT
[6]   A controlled genetic algorithm by fuzzy logic and belief functions for job-shop scheduling [J].
Hajri, S ;
Liouane, N ;
Hammadi, S ;
Borne, P .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2000, 30 (05) :812-818
[7]   Variable neighborhood search: Principles and applications [J].
Hansen, P ;
Mladenovic, N .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 130 (03) :449-467
[8]   A new robust optimization approach for scheduling under uncertainty - II. Uncertainty with known probability distribution [J].
Janak, Stacy L. ;
Lin, Xiaoxia ;
Floudas, Christodoulos A. .
COMPUTERS & CHEMICAL ENGINEERING, 2007, 31 (03) :171-195
[9]   Generating robust and flexible job shop schedules using genetic algorithms [J].
Jensen, MT .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2003, 7 (03) :275-288
[10]   A multi-objective genetic algorithm for robust flight scheduling using simulation [J].
Lee, Loo Hay ;
Lee, Chul Ung ;
Tan, Yen Ping .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (03) :1948-1968