Construction management process reengineering: Organizational human resource planning for multiple projects

被引:22
作者
Cheng, Min-Yuan [1 ]
Tsai, Ming-Hsiu [1 ]
Xiao, Zhi-Wei [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Construct Engn, Taipei 106, Taiwan
关键词
human resource planning; construction management process reengineering; team-based organization; simulation;
D O I
10.1016/j.autcon.2005.10.014
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Applying the business process reengineering and organization planning philosophy, this study focuses on human resource planning in construction management process reengineering (CMPR) to develop a team-based human resource planning (THRP) method for deploying laborpower. The THRP method has two purposes; the first is to determine the maximum loading of projects the original laborpower can carry, and the second is to identify the range of laborpower required for expected project loadings in the future. The THRP method includes four phases, namely, process reengineering, data preparing, human resource allocation, and simulation. Using the THRP method, a construction company cannot only design a team-based organizational structure, but also allocate human resources based on cross-functional processes. Moreover, human resource utilizations before and after CMPR can be compared to evaluate savings attributable to the CMPR. As a consequence, optimum laborpower can be assessed, and human resources allocated to fit the changing processes and circumstances of a construction company's growing business. (C) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:785 / 799
页数:15
相关论文
共 21 条
  • [1] PROBABILISTIC SIMULATION STUDIES FOR REPETITIVE CONSTRUCTION PROCESSES
    ABOURIZK, SM
    HALPIN, DW
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04): : 575 - 594
  • [2] [Anonymous], 1993, Process Innovation
  • [3] [Anonymous], BUSINESS PROCESS CHA
  • [4] BERNOLD LE, 1989, J CONSTR ENG M ASCE, V115, P163
  • [5] Reengineering of construction management process
    Cheng, MY
    Tsai, MH
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (01): : 105 - 114
  • [6] Optimal project organizational structure for construction management
    Cheng, MY
    Su, CW
    You, HY
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (01): : 70 - 79
  • [7] Halpin D.W., 1973, Ph.D. Thesis
  • [8] HALPIN DW, 1977, J CONSTRUCT DIV-ASCE, V103, P489
  • [9] HAMMER M, 1990, HARVARD BUS REV, V68, P104
  • [10] Hammer M., 2001, REENGINEERING CORPOR