Paradigm Trajectories of Building Information Modeling Practice in Project Networks

被引:120
作者
Taylor, John E. [1 ]
Bernstein, Phillip G. [2 ]
机构
[1] Columbia Univ, Dept Civil Engn & Engn Mech, New York, NY 10027 USA
[2] Yale Univ, Sch Architecture, New Haven, CT 06511 USA
关键词
CONSTRUCTION;
D O I
10.1061/(ASCE)0742-597X(2009)25:2(69)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Researchers have examined building information modeling (BIM), or parametric three-dimensional computer-aided design, from a myriad of technological perspectives. Many of these studies focus on examining or enhancing the interoperability of building information modeling technologies across project networks. The interoperability of business practices that must complement technological interoperability has been largely ignored. In this paper we examine building information modeling practice paradigms in project networks. We combine qualitative and quantitative data and analytical approaches to investigate 26 specific cases of firms using BIM tools. We identify four distinct practice paradigms and then induce an evolutionary model for building information modeling practice paradigm trajectories in project networks. The findings highlight the importance of understanding and developing interorganizational work practices to reap the benefits of building information modeling.
引用
收藏
页码:69 / 76
页数:8
相关论文
共 24 条
[1]   Formalization and automation of time-space conflict analysis [J].
Akinci, B ;
Fischen, M ;
Levitt, R ;
Carlson, R .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2002, 16 (02) :124-134
[2]  
CHINOWSKY P, 2007, REVALUING CONSTRUCTI, P54
[4]   BETTER STORIES AND BETTER CONSTRUCTS - THE CASE FOR RIGOR AND COMPARATIVE LOGIC [J].
EISENHARDT, KM .
ACADEMY OF MANAGEMENT REVIEW, 1991, 16 (03) :620-627
[5]   BUILDING THEORIES FROM CASE-STUDY RESEARCH [J].
EISENHARDT, KM .
ACADEMY OF MANAGEMENT REVIEW, 1989, 14 (04) :532-550
[6]   Automating constructibility reasoning with a geometrical and topological project model [J].
Fischer, M.A. .
Computing Systems in Engineering: An International Journal, 1993, 4 (2-3)
[7]  
Gallaher MichaelAlan O'Connor., 2004, COST ANAL INADEQUATE
[8]  
Glaser B. G., 1967, DISCOV GROUNDED THEO
[9]   Building integrated architecture/engineering/construction systems using smart objects: Methodology and implementation [J].
Halfawy, M ;
Froese, T .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2005, 19 (02) :172-181
[10]   Innovation in construction: a sociology of technology approach [J].
Harty, C .
BUILDING RESEARCH AND INFORMATION, 2005, 33 (06) :512-522