Makespan minimization for chemical batch processes using non-uniform time grids

被引:18
作者
Burkard, RE
Fortuna, T
Hurkens, CAJ
机构
[1] Graz Tech Univ, Inst Math B, A-8010 Graz, Austria
[2] Eindhoven Univ Technol, Dept Math & Comp Sci, NL-5600 MB Eindhoven, Netherlands
关键词
multi-product and multi-facility production planning; batch production systems; scheduling problems;
D O I
10.1016/S0098-1354(02)00097-2
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We present a mixed-integer linear programming model for minimizing the makespan of batch processes occurring in the chemical industry. The formulation of the model is based on the starting and processing times of the batches without using an external uniform time grid. A special form for the objective function is chosen and additional redundant constraints are added in order to speed up the solution process. A comparison with the classical uniform time discretization model shows that in many cases the size of the new model as well as its solution time is smaller. Computational results on several instances are reported. The modular structure of the model allows a combination with other continuous-time models for batch processing problems. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:1321 / 1332
页数:12
相关论文
共 18 条
[1]  
AHLEFF J, 1995, THESIS RWTH AACHEN
[2]  
[Anonymous], FLORA TROPICAL AFRIC
[3]   Scheduling of a multi-product batch process in the chemical industry [J].
Blomer, F ;
Gunther, HO .
COMPUTERS IN INDUSTRY, 1998, 36 (03) :245-259
[4]   A process scheduling problem arising from chemical production planning [J].
Burkard, RE ;
Hujter, M ;
Klinz, B ;
Rudolf, R ;
Wennink, M .
OPTIMIZATION METHODS & SOFTWARE, 1998, 10 (02) :175-196
[5]   Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4341-4359
[6]   Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4360-4374
[7]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227
[8]   Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization [J].
Mockus, L ;
Reklaitis, GV .
COMPUTERS & CHEMICAL ENGINEERING, 1997, 21 (10) :1147-1156
[9]  
REKLAITIS GV, 1996, NATO ASI SERIES COMP, V143
[10]  
ROSENAU B, 1996, THESIS PHILIPPS U MA