Optimization of safety equipment outages improves safety

被引:74
作者
Cepin, M [1 ]
机构
[1] Jozef Stefan Inst, Reactor Engn Div, Ljubljana, Slovenia
关键词
safety; reliability; probabilistic safety assessment; risk; optimization;
D O I
10.1016/S0951-8320(02)00030-3
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Testing and maintenance activities of safety equipment in nuclear power plants are an important potential for risk and cost reduction. An optimization method is presented based on the simulated annealing algorithm. The method determines the optimal schedule of safety equipment outages due to testing and maintenance based on minimization of selected risk measure. The mean value of the selected time dependent risk measure represents the objective function of the optimization. The time dependent function of the selected risk measure is obtained from probabilistic safety assessment, i.e. the fault tree analysis at the system level and the fault tree/event tree analysis at the plant level, both extended with inclusion of time requirements. Results of several examples showed that it is possible to reduce risk by application of the proposed method. Because of large uncertainties in the probabilistic safety assessment, the most important result of the method may not be a selection of the most suitable schedule of safety equipment outages among those, which results in similarly low risk. But, it may be a prevention of such schedules of safety equipment outages, which result in high risk. Such finding increases the importance of evaluation speed versus the requirement of getting always the global optimum no matter if it is only slightly better that certain local one. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:71 / 80
页数:10
相关论文
共 30 条
[1]   A useful framework for optimal replacement models [J].
Aven, T ;
Dekker, R .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1997, 58 (01) :61-67
[2]   An approach for using risk assessment in risk-informed decisions on plant-specific changes to the licensing basis [J].
Caruso, MA ;
Cheok, MC ;
Cunningham, MA ;
Holahan, GM ;
King, TL ;
Parry, GW ;
Ramey-Smith, AM ;
Rubin, MP ;
Thadani, AC .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1999, 63 (03) :231-242
[3]   A dynamic fault tree [J].
Cepin, M ;
Mavko, B .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2002, 75 (01) :83-91
[4]   Fault tree developed by an object-based method improves requirements specification for safety-related systems [J].
Cepin, M ;
Mavko, B .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1999, 63 (02) :111-125
[5]   Probabilistic safety assessment improves surveillance requirements in technical specifications [J].
Cepin, M ;
Mavko, B .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1997, 56 (01) :69-77
[6]  
Cepin M, 1999, SAFETY AND RELIABILITY, VOLS 1 & 2, P247
[7]  
CEPIN M, 2000, DEV NEW METHODS MODE, P339
[8]  
CEPIN M, 1995, P 2 REG M NUCL EN CE, P184
[9]  
CEPIN M, 2001, ESTIMATION EVENT FRE
[10]   An optimal inspection strategy for randomly failing equipment [J].
Chelbi, A ;
Ait-Kadi, D .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1999, 63 (02) :127-131