Contingency-constrained congestion management with a minimum number of adjustments in preferred schedules

被引:39
作者
Alomoush, MI [1 ]
Shahidehpour, SM [1 ]
机构
[1] IIT, Dept Elect & Comp Engn, Chicago, IL 60616 USA
关键词
power system operation; transmission network; congestion management; contingency analysis;
D O I
10.1016/S0142-0615(99)00059-9
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Transmission network plays a major role in the open access deregulated power market. In this environment, transmission congestion is a major problem that requires further consideration especially when inter-zonal/intra-zonal scheme is implemented. A congestion problem formulation should take into consideration interactions between intra-zonal and inter-zonal hows and their effects on power systems. It is perceived that phase-shifters and tap transformers play vital preventive and corrective roles in congestion management. These control devices help the ISO mitigate congestion without re-dispatching generation away from preferred schedules. In this paper, we introduce a procedure for minimizing the number of adjustments of preferred schedules to alleviate congestion and apply control schemes to minimize interactions between zones while taking contingency-constrained limits into consideration. The paper shows the stage where the ISO performs contingency analysis during congestion management, and shows the effect of contingency limits on congestion management. The proposed formulation will save computation time, increase the system security and apply control variables efficiently in the transmission system management to keep power system operation close to preferred schedules. (C) 2000 Elsevier Science Ltd. Ail rights reserved.
引用
收藏
页码:277 / 290
页数:14
相关论文
共 17 条
[1]   A FUZZY - BASED OPTIMAL REACTIVE POWER-CONTROL [J].
ABDULRAHMAN, KH ;
SHAHIDEHPOUR, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (02) :662-670
[2]   APPLICATION OF FUZZY-SETS TO OPTIMAL REACTIVE POWER PLANNING WITH SECURITY CONSTRAINTS [J].
ABDULRAHMAN, KH ;
SHAHIDEHPOUR, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (02) :589-597
[3]   A practical resource scheduling with OPF constraints [J].
AbdulRahman, KH ;
Shahidehpour, SM ;
Aganagic, M ;
Mokhtari, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) :254-259
[4]   REACTIVE POWER CONSIDERATIONS IN AUTOMATIC CONTINGENCY SELECTION [J].
ALBUYEH, F ;
BOSE, A ;
HEATH, B .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1982, 101 (01) :107-112
[5]  
ALOMOUSH M, 1998, LARG ENG SYST C POW
[6]  
DEEB N, 1990, IEEE T POWER SYSTEMS, V5, P1454
[7]   CROSS DECOMPOSITION FOR MULTIAREA OPTIMAL REACTIVE POWER PLANNING [J].
DEEB, NI ;
SHAHIDEHPOUR, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (04) :1539-1544
[8]   IMPROVED SYSTEM OPERATION BY OPTIMAL ADJUSTMENT OF REACTIVE GENERATION IN ELECTRIC-POWER NETWORKS [J].
DEEB, NI ;
SHAHIDEHPOUR, SM .
INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 1990, 14 (06) :651-664
[9]  
EJEBE GC, 1979, IEEE T POWER APPARAT, V98, P92
[10]   On transmission congestion and pricing [J].
Gedra, TW .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (01) :241-248