Scheduling and Provision of Secondary Frequency Reserves by Aggregations of Commercial Buildings

被引:74
作者
Vrettos, Evangelos [1 ]
Andersson, Goeran [1 ]
机构
[1] Swiss Fed Inst Technol, EEH Power Syst Lab, CH-8092 Zurich, Switzerland
关键词
Ancillary services; frequency control; demand response; commercial buildings; robust and stochastic optimization; chance-constraints; model predictive control; MODEL-PREDICTIVE CONTROL; ANCILLARY SERVICES; DEMAND RESPONSE;
D O I
10.1109/TSTE.2015.2497407
中图分类号
X [环境科学、安全科学];
学科分类号
083001 [环境科学];
摘要
Due to thermal inertia, commercial buildings can provide power system frequency reserves with the heating, ventilation and air-conditioning (HVAC) systems. In this paper, we follow up on a recently proposed framework for scheduling and provision of secondary frequency control (SFC) reserves within a building aggregation. We extend this framework with a new reserve scheduling formulation, which is based on a combination of robust and stochastic optimization, to allocate reserve capacities among buildings. The HVAC system setpoints are determined by a model predictive controller, the frequency signal is tracked by heat pump (HP) control with virtually no occupant discomfort, and the tracking quality is evaluated using a dynamic HP model. In simulations, we consider an aggregation of typical Swiss office buildings and compare the robust and stochastic reserve scheduling approaches in terms of performance and complexity. Using the framework, we demonstrate the importance of energy-constrained SFC signals and asymmetric reserves with hourly resolution, and we investigate the sensitivity of reserves on the comfort zone's width, capacity payments, and HP constraints. Finally, we show that commercial buildings can track SFC signals well and substitute generators in SFC.
引用
收藏
页码:850 / 864
页数:15
相关论文
共 36 条
[1]
[Anonymous], P EUR C POW EL APPL
[2]
Boyd S, 2004, CONVEX OPTIMIZATION
[3]
Brasz J., 2008, P INT COMPR ENG C W, P1
[4]
Achieving Controllability of Electric Loads [J].
Callaway, Duncan S. ;
Hiskens, Ian A. .
PROCEEDINGS OF THE IEEE, 2011, 99 (01) :184-199
[5]
The scenario approach for systems and control design [J].
Campi, Marco C. ;
Garatti, Simone ;
Prandini, Maria .
ANNUAL REVIEWS IN CONTROL, 2009, 33 (02) :149-157
[6]
ENTSO-e, 2014, SURV ANC SERV PROC E
[7]
ENTSO-E, 2013, Tech. Rep.
[8]
Model Development and Identification for Fast Demand Response in Commercial HVAC Systems [J].
Goddard, Gary ;
Klose, Joseph ;
Backhaus, Scott .
IEEE TRANSACTIONS ON SMART GRID, 2014, 5 (04) :2084-2092
[9]
Ancillary Service to the Grid Through Control of Fans in Commercial Building HVAC Systems [J].
Hao, He ;
Lin, Yashen ;
Kowli, Anupama S. ;
Barooah, Prabir ;
Meyn, Sean .
IEEE TRANSACTIONS ON SMART GRID, 2014, 5 (04) :2066-2074
[10]
He DW, 2013, IEEE IND ELEC, P2205, DOI 10.1109/IECON.2013.6699473