Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing

被引:53
作者
Stadtler, H
机构
[1] Fg. Fertigungs-und M., Inst. fur Betriebswirtschaftslehre, Technische Hochschule Darmstadt, D-64289 Darmstadt
关键词
production planning; lotsize; mathematical programming;
D O I
10.1016/0377-2217(95)00094-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Recently there have been two new proposals to model the dynamic multi-item multi-level capacitated lotsizing problem by variable redefinitions based on either a shortest route or a simple plant location representation of the underlying decision problem. Here we will introduce an extended version of the well-known inventory and lotsize model followed by a new model formulation based on modeling the changes of end-of-period inventory levels explicitly. Secondly, we will compare the suitability of different model formulations when solving problem instances with up to 40 items and 16 periods utilizing state-of-the-art standard MTP software on a personal computer.
引用
收藏
页码:561 / 581
页数:21
相关论文
共 17 条
[1]   CAPACITATED LOT-SIZING WITH MINIMUM BATCH SIZES AND SETUP TIMES [J].
ANDERSON, EJ ;
CHEAH, BS .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 30-1 :137-152
[2]  
[Anonymous], 1977, NUMERISCHE METHODEN
[3]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[4]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186
[5]  
*DASH ASS, 1993, XPRESS MP US GUID RE
[6]  
DOMSCHKE W, 1993, PRODUKTIONSPLANUNG
[7]  
DREXL A, 1994, Z BETRIEBSWIRT, V64, P1022
[8]   SOLVING MULTI-ITEM CAPACITATED LOT-SIZING PROBLEMS USING VARIABLE REDEFINITION [J].
EPPEN, GD ;
MARTIN, RK .
OPERATIONS RESEARCH, 1987, 35 (06) :832-848
[9]   MULTILEVEL CAPACITATED LOTSIZING COMPLEXITY AND LP-BASED HEURISTICS [J].
MAES, J ;
MCCLAIN, JO ;
VANWASSENHOVE, LN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 53 (02) :131-148
[10]  
ORLICKY J, 1975, MATERIAL REQUIREMENT