GA application to optimization of AGC in three-area power system after deregulation

被引:115
作者
Demiroren, A. [1 ]
Zeynelgil, H. L. [1 ]
机构
[1] Istanbul Tech Univ, Elect & Elect Fac, TR-34469 Istanbul, Turkey
关键词
automatic generation control; optimization; power system control; genetic algorithm; area control error;
D O I
10.1016/j.ijepes.2006.07.005
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, genetic algorithm (GA), which is used for optimization of integral gains and bias factors, is applied to automatic generation control (AGC) in three-area power system after deregulation. The conventional three-area AGC system is modified to take into account the effect of bilateral contracts on the dynamics. In the considered power system, each area contains two GENCOs; GENCOs at the first and the second areas include steam turbines and GENCOs at the third area include hydro turbines as generating units. After deregulation, to describe bilateral contract for three-area, AGC, DISCO participation matrix is used. The performance of the system is studied for different operating cases, in terms of the conventional controller gains and bias factors optimized using real coded GA. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:230 / 240
页数:11
相关论文
共 10 条
[1]  
[Anonymous], 1991, Handbook of genetic algorithms
[2]  
[Anonymous], 1999, UNDERSTANDING ELECT
[3]   Load frequency control issues in power system operations after deregulation - Response [J].
Christie, RD ;
Bose, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (03) :1199-1200
[4]  
Demiroren A., 2001, IEEE PORTO POWER TEC, V2, P0
[5]   Simulation and optimization in an AGC system after deregulation [J].
Donde, V ;
Pai, MA ;
Hiskens, IA .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (03) :481-489
[6]  
Herrera F., 1996, GENETIC ALGORITHMS S
[7]   AGC simulator for price-based operation .1. A model [J].
Kumar, J ;
Ng, KH ;
Sheble, G .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1997, 12 (02) :527-532
[8]   AGC simulator for price-based operation .2. Case study results [J].
Kumar, J ;
Ng, KH ;
Sheble, G .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1997, 12 (02) :533-538
[9]   AUTOMATIC-GENERATION CONTROL OF AN INTERCONNECTED POWER-SYSTEM [J].
NANDA, J ;
KAUL, BL .
PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1978, 125 (05) :385-390
[10]   OPTIMIZATION OF LOAD-FREQUENCY CONTROL PARAMETERS FOR POWER-SYSTEMS WITH REHEAT STEAM-TURBINES AND GOVERNOR DEADBAND NONLINEARITY [J].
TRIPATHY, SC ;
HOPE, GS ;
MALIK, OP .
IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1982, 129 (01) :10-16