A stochastic model of a reconfigurable manufacturing system Part 1: A framework

被引:77
作者
Zhao, XB [1 ]
Wang, JC
Luo, ZB
机构
[1] Tsing Hua Univ, Sch Econ & Management, Beijing 100084, Peoples R China
[2] Tsing Hua Univ, Dept Precis Instruments, Beijing 100084, Peoples R China
关键词
D O I
10.1080/00207540050028098
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Products required by customers are classified into several product families, each of which is a set of similar products. A reconfigurable manufacturing system (RMS) manages to satisfy customers, with each family corresponding to one configuration of the RMS. Then the products belonging to the same family will be produced by the RMS under the corresponding configuration. The manufacturing system possesses the reconfigurable function for different families. In an RMS there are three important issues: the optimal configurations in the design, the optimal selection policy in the utilization, and the performance measure in the improvement. This paper proposes a framework for a stochastic model of an RMS, which involves the above issues. Two optimization problems and the performance measure stemmed from the issues are formulated. An example is given for illustration. Some discussions are presented for future research work.
引用
收藏
页码:2273 / 2285
页数:13
相关论文
共 14 条
[1]  
ARONSON RB, 1997, MANUFACTURING ENG, P108
[2]   Heuristic scheduling of parallel heterogeneous queues with set-ups [J].
Duenyas, I ;
VanOyen, MP .
MANAGEMENT SCIENCE, 1996, 42 (06) :814-829
[3]   A new comprehensive sheared delay formula for traffic signal optimisation [J].
Han, B .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1996, 30 (02) :155-171
[4]   Facility layout design in a changing environment [J].
Kochhar, JS ;
Heragu, SS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (11) :2429-2446
[5]  
KOREN Y, 1999, ANN CIRP, V48, P1
[6]   Project scheduling algorithms for re-layout projects [J].
Lacksonen, TA ;
Hung, CY .
IIE TRANSACTIONS, 1998, 30 (01) :91-99
[7]   Reconfigurability consideration design of components and manufacturing systems [J].
Lee, GH .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1997, 13 (05) :376-386
[8]   A COMPUTER-BASED PRODUCTION SCHEDULING ARCHITECTURE SUITABLE FOR DRIVING A RECONFIGURABLE MANUFACTURING SYSTEM [J].
LILES, DH ;
HUFF, BL .
COMPUTERS & INDUSTRIAL ENGINEERING, 1990, 19 (1-4) :1-5
[9]  
MAKINO H, 1994, ANN CIRP, V43, P501
[10]  
Monden Y., 1993, TOYOTA PRODUCTION SY, V2nd