Advance rates of hard rock TBMs and their effects on project economics

被引:56
作者
Alber, M [1 ]
机构
[1] Tech Univ Berlin, D-13355 Berlin, Germany
关键词
D O I
10.1016/S0886-7798(00)00029-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Estimation of bid prices for hard rock TBM drives needs to incorporate the variability of project duration. The project duration depends mainly on the TBM advance rates, which are difficult to estimate. The advance rate may be estimated from the knowledge about the penetration rate and the TBM utilization in a given set of geologic conditions. This paper describes a method for probabilistic estimations of advance rates and evaluates their effects on project economics by cash flow analysis. (C) 2000 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:55 / 64
页数:10
相关论文
共 22 条
[1]  
Alber M, 1998, EIGHTH INTERNATIONAL CONGRESS INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY AND THE ENVIRONMENT, PROCEEDINGS, VOLS 1-5, P3537
[2]  
ALBER M, 1996, P INT C EUR 96 BALK, P721
[3]  
ALBER M, 1996, TUNNELS TUNNELLI DEC, P41
[4]  
[Anonymous], 1988, TUNN UNDERGR SP TECH, V3, P103
[5]  
[Anonymous], TUNNELS TUNN INT
[6]  
Bieniawski Z.T., 1989, Engineering Rock Mass Classifications
[7]  
BUCHI E, 1984, THESIS U BERN
[8]  
CORBETT G, 1996, P INT C RAIL ROAD TU, P55
[9]  
Gentry DW., 1984, MINE INVESTMENT ANAL
[10]  
Hoek E, 1988, P 15 CAN ROCK MECH S, V15, P31