Preemptive multiprocessor task scheduling with release times and time windows

被引:17
作者
Bianco, L
Blazewicz, J
DellOlmo, P
Drozdowski, M
机构
[1] CNR,IST ANAL SISTEMI & INFORMAT,I-00185 ROME,ITALY
[2] POLITECHN POZNANSKA,INST INFORMAT,POZNAN,POLAND
关键词
parallel processing; multiprocessor tasks; preemptive scheduling; release times; scheduling in time windows; polynomial time algorithms;
D O I
10.1023/A:1018994726051
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Classical scheduling theory assumed that a task may require for its processing only one processor at a time. This assumption is not obvious in the context of new parallel computer systems and parallel algorithms. In this work, we consider preemptive deterministic scheduling of multiprocessor tasks, each of which may require a set of processors at a time. In general, tasks may appear in the system in different moments of time. We will also consider the problem of scheduling such tasks in time windows on particular processors. The existence of low-order polynomial time algorithms for the above problems with C-max and L-max criteria will be analyzed. The general case of the problem can be solved using a linear programming approach.
引用
收藏
页码:43 / 55
页数:13
相关论文
共 24 条
[1]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[2]   SCHEDULING PREEMPTIVE MULTIPROCESSOR TASKS ON DEDICATED PROCESSORS [J].
BIANCO, L ;
BLAZEWICZ, J ;
DELLOLMO, P ;
DROZDOWSKI, M .
PERFORMANCE EVALUATION, 1994, 20 (04) :361-371
[3]   PREEMPTIVE SCHEDULING OF MULTIPROCESSOR TASKS ON THE DEDICATED PROCESSOR SYSTEM SUBJECT TO MINIMAL LATENESS [J].
BIANCO, L ;
BLAZEWICZ, J ;
DELLOLMO, P ;
DROZDOWSKI, M .
INFORMATION PROCESSING LETTERS, 1993, 46 (03) :109-113
[4]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[5]  
BLAZEWICZ J, 1992, INFORM PROCESS LETT, V41, P275, DOI 10.1016/0020-0190(92)90172-R
[6]  
BLAZEWICZ J, 1986, IEEE T COMPUT, V35, P389
[7]   SCHEDULING MULTIPROCESSOR TASKS ON 3 DEDICATED PROCESSORS INFORMATION-PROCESSING LETTERS (VOL 41, PG 275, 1992) [J].
BLAZEWICZ, J ;
DELLOLMO, P ;
DROZDOWSKI, M ;
SPERANZA, MG .
INFORMATION PROCESSING LETTERS, 1994, 49 (05) :269-270
[8]  
BLAZEWICZ J, 1994, SCHEDULING COMPUTER
[9]  
COFFMAN EG, 1985, SIAM J COMPUT, V14, P744, DOI 10.1137/0214054
[10]  
Coffman Jr E. G., 1976, COMPUTER JOB SHOP SC