A multi-objective particle swarm for a flow shop scheduling problem

被引:87
作者
Rahimi-Vahed, A. R. [1 ]
Mirghorbani, S. M. [1 ]
机构
[1] Univ Tehran, Fac Engn, Dept Ind Engn, Tehran, Iran
关键词
bi-criteria flow shop scheduling problem; permutation flow shop; multi-objective particle swarm; multi-objective genetic algorithm;
D O I
10.1007/s10878-006-9015-7
中图分类号
TP39 [计算机的应用];
学科分类号
081203 [计算机应用技术]; 0835 [软件工程];
摘要
Flow shop problems as a typical manufacturing challenge have gained wide attention in academic fields. In this paper, we consider a bi-criteria permutation flow shop scheduling problem, where weighted mean completion time and weighted mean tardiness are to be minimized simultaneously. Since a flow shop scheduling problem has been proved to be NP-hard in strong sense, an effective multi-objective particle swarm (MOPS), exploiting a new concept of the Ideal Point and a new approach to specify the superior particle's position vector in the swarm, is designed and used for finding locally Pareto-optimal frontier of the problem. To prove the efficiency of the proposed algorithm, various test problems are solved and the reliability of the proposed algorithm, based on some comparison metrics, is compared with a distinguished multi-objective genetic algorithm, i.e. SPEA-II. The computational results show that the proposed MOPS performs better than the genetic algorithm, especially for the large-sized problems.
引用
收藏
页码:79 / 102
页数:24
相关论文
共 58 条
[1]
Job-shop sequencing problems via network scheduling technique [J].
Akpan, EOP .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1996, 16 (03) :76-&
[2]
MOSS multiobjective scatter search applied to non-linear multiple criteria optimization [J].
Beausoleil, RP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (02) :426-449
[3]
A tabu search approach for the flow shop scheduling problem [J].
Ben-Daya, M ;
Al-Fawzan, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (01) :88-95
[4]
The job shop scheduling problem: Conventional and new solution techniques [J].
Blazewicz, J ;
Domschke, W ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 93 (01) :1-33
[5]
A comparison of solution procedures for two-machine flow shop scheduling with late work criterion [J].
Blazewicz, J ;
Pesch, E ;
Sterna, M ;
Werner, F .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 49 (04) :611-624
[6]
The two-machine flow-shop problem with weighted late work criterion and common due date [J].
Blazewicz, J ;
Pesch, E ;
Sterna, M ;
Werner, F .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) :408-415
[7]
Minimizing the weighted number of tardy jobs on a two-machine flow shop [J].
Bulfin, RL ;
M'Hallah, R .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (12) :1887-1900
[8]
[9]
CHOI BC, 2005, EUR J OPER RES
[10]
Clerc M., 2002, Proceedings of the 1999 Congress on Evolutionary Computation, DOI [10.1109/CEC.1999.785513, DOI 10.1109/CEC.1999.785513]