Early order completion contract approach to minimize the impact of demand uncertainty on supply chains

被引:17
作者
Chan, Hing Kai [1 ]
Chan, Felix T. S. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
contract; coordination; simulation; supply chain management; uncertainty;
D O I
10.1109/TII.2005.864217
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Many optimization techniques have been proposed over the years to improve the performance of supply chains. Although these approaches have been shown to be effective, most of them were developed without considering uncertainties in supply chains to simplify the analysis. In fact, uncertainties can deteriorate the performance of supply chains, such as increase in total cost, or drop in fill rate, of the whole system. In distributed supply chains, participating members are not under a sole control by a central authority, the problem is even more stringent due to incomplete information sharing, or so called asymmetrical information sharing. One way to improve the system performance is to achieve coordination among participating parties through establishment of contracts. The objectives of this paper are i) to evaluate the effects of demand uncertainty in a distributed supply chain, which is modelled as an agent-based system; ii) to propose a coordination mechanism with early order completion contract to minimize the negative impacts of demand uncertainty; and iii) to present associated simulation results. Performance of the system is measured in terms of costs and fill rate. Simulation results indicate that the proposed contract approach is able to improve the performance measures of the system.
引用
收藏
页码:48 / 58
页数:11
相关论文
共 29 条
[1]   A new model for manufacturing supply chain networks: a multiagent approach [J].
Chan, FTS ;
Chan, HK .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2004, 218 (04) :443-454
[2]   The future trend on system-wide modelling in supply chain studies [J].
Chan, FTS ;
Chan, HK .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 25 (7-8) :820-832
[3]  
CHAN FTS, 2003, CD P 9 INT C MAN EXC
[4]  
Chan HK, 2004, IEEE SYS MAN CYBERN, P4535
[5]  
CHAN HK, 2005, CD P 3 INT IEEE C IN
[6]   Coordination of the supply chain of seasonal products [J].
Chen, J ;
Xu, LJ .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2001, 31 (06) :524-532
[7]  
Christopher M., 1998, LOGISTICS SUPPLY CHA, V2nd
[8]  
EVANS JR, 1997, PRODUCTION OPERATION
[9]  
Fisher M., 1997, Production and Operations Management, V6, P211, DOI 10.1111/j.1937-5956.1997.tb00427.x
[10]   Scheduling uncertain orders in the customer-subcontractor context [J].
Geneste, L ;
Grabot, B ;
Letouzey, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 147 (02) :297-311