Swine wastewater treatment in a two stage sequencing batch reactor using real-time control

被引:21
作者
Cheng, N [1 ]
Lo, KV [1 ]
Yip, KH [1 ]
机构
[1] Univ British Columbia, Dept Chem & Bioresource Engn, Vancouver, BC V6T 1Z4, Canada
关键词
swine wastewater; treatment; two-stage SBR; and real-time control;
D O I
10.1080/03601230009373277
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A laboratory scale two-stage sequencing batch reactor (TSSBR) was used to study the effectiveness of pH as a real-time control parameter in swine wastewater treatment. A Ringlace media was inserted into the A/O (Anoxic/Oxic) reactor for bacteria immobilization. The TSSBR was subjected to three levels of organic loading. The pH and ORP (Oxidation Reduction Potential) patterns obtained were consistent with distinct features, enabling the real-time control strategy to effectively set a flexible aeration time pending on influent concentration, hence resulting in flexible cycle time and HRT (Hydraulic Retention Time) for the system. The real-time process ensured a removal efficiency of over 99% and 95%, respectively, for ammonia and TOC (Total Organic Carbon). For NO3--N and PO4-3, the run with influent TOC = 4,000 mg/L yielded the most efficient removal of 61% and 95%, respectively. Test results suggest that pH can be a viable tool for on-line real-time control of a biological treatment process.
引用
收藏
页码:379 / 398
页数:20
相关论文
共 12 条
[1]   USE OF PH AS CONTROL PARAMETER FOR AEROBIC/ANOXIC SLUDGE-DIGESTION [J].
ALGHUSAIN, I ;
HAO, OJ .
JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1995, 121 (03) :225-235
[2]  
[Anonymous], 1995, Standard methods for examination of water and waste water, V19th
[3]   OXIDATION REDUCTION POTENTIAL (ORP) REGULATION AS A WAY TO OPTIMIZE AERATION AND C-REMOVAL, N-REMOVAL AND P-REMOVAL - EXPERIMENTAL BASIS AND VARIOUS FULL-SCALE EXAMPLES [J].
CHARPENTIER, J ;
GODART, H ;
MARTIN, G ;
MOGNO, Y .
WATER SCIENCE AND TECHNOLOGY, 1989, 21 (10-11) :1209-1223
[4]  
CHENG N, 1999, ADV ENVIRON RES, V3, P166
[5]  
FERNANDES L, 1991, CAN AGR ENG, V33, P373
[6]  
HONG WZ, 1997, THESIS U B C VANCOUV
[7]   INFLUENCE OF NITRATE ON ACETIC-ACID INDUCED BIOLOGICAL PHOSPHATE REMOVAL [J].
IWEMA, A ;
MEUNIER, A .
WATER SCIENCE AND TECHNOLOGY, 1985, 17 (11-1) :289-294
[8]  
KOCH FA, 1988, P JOINT ASCE CSCE EN, P162
[9]   USE OF ORP FOR MONITORING AND CONTROL OF AEROBIC SLUDGE-DIGESTION [J].
PEDDIE, CC ;
MAVINIC, DS ;
JENKINS, CJ .
JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1990, 116 (03) :461-471
[10]   Real-time control of two-stage sequencing batch reactor system for the treatment of animal wastewater [J].
Ra, CS ;
Lo, KV ;
Mavinic, DS .
ENVIRONMENTAL TECHNOLOGY, 1998, 19 (04) :343-356