Procurement methods for US infrastructure: historical perspectives and recent trends

被引:72
作者
Pietroforte, R
Miller, JB
机构
[1] Worcester Polytech Inst, Dept Civil & Environm Engn, Worcester, MA 01609 USA
[2] MIT, Dept Civil & Environm Engn, Cambridge, MA 02139 USA
关键词
building stock; business systems; construction business system; Design-Build; Design-Build-Finance-Operate; Design-Build-Operate; infrastructure; life-cycle costs; maintenance; portfolio management; project delivery methods; public investment; public policy; public/private partnership; United States;
D O I
10.1080/09613210210159875
中图分类号
TU [建筑科学];
学科分类号
0813 [建筑学];
摘要
This paper is concerned with emerging trends within the delivery systems and financing methods of public and private infrastructure projects in the US, and with the ongoing debate on public/private partnerships. Project delivery methods and more generally the procurement policies that currently drive the management of the US infrastructure system are explored. The historical evolution of government procurement policies of facilities indicates a wide variety of strategies including a dual-track procurement strategy that used a combination of different delivery methods and, in many instances, private financing. The methods ranged from the combined procurement of the design, construction, operation and maintenance of a facility, such as Design-Build-Operate (DBO) and Design-Build-Finance-Operate (known outside the US as 'BOT'), to the separate procurement of these services, such as Design-Bid-Building (DBB) and Design-Build (DB). In the last 50 years, there has been a shift toward the exclusive reliance on separate procurement such as DBB and the use of public funding. This approach is not sustainable financially, considering the widening gap between the availability of public funds and the increasing needs of the existing infrastructure system. Some drivers that foster a possible future shift in public procurement procedures are highlighted as well as the development of a more efficient infrastructure management practice.
引用
收藏
页码:425 / 434
页数:10
相关论文
共 25 条
[1]
*ABA, 2000, 2000 ABA MOD PROC CO
[2]
*AIA, 1974, J330 AIA
[3]
ANGELO W, 2000, ENG NEWS RECORD 1127, P75
[4]
[Anonymous], AM CIVIL ENG 1852 19
[5]
DANIELS SH, 2000, ENG NEWS RECORD 0501, P15
[6]
Dobbin F., 1994, FORGING IND POLICY U
[7]
CHOOSING APPROPRIATE CONSTRUCTION CONTRACTING METHOD [J].
GORDON, CM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (01) :196-210
[8]
GROGAN T, 2000, ENG NEWS RECORD 0915, P15
[9]
HANCHER DE, 1999, TR NEWS NOV, P10
[10]
LINCOLN A, 1988, DESIGN BUILD APPROAC, P15