Optimization of boiler start-up using a nonlinear boiler model and hard constraints

被引:58
作者
Krüger, K
Franke, R
Rode, M
机构
[1] ABB Utilities GMBH, UTD, PAT, D-68309 Mannheim, Germany
[2] ABB Corp Res Ctr, DECRC 14, D-68526 Ladenburg, Germany
关键词
D O I
10.1016/j.energy.2004.03.022
中图分类号
O414.1 [热力学];
学科分类号
摘要
The basis for control optimization is a nonlinear modeling for a drum-type boiler consisting of furnace, economizer, evaporator, superheaters, attemperator, turbine bypass and thick-walled components such as boiler drum and superheater header. After the mathematical formulation of the boiler start-up optimization problem and of the cost function, including the related hard constraints for inputs and states, the optimal reference and input control are calculated using a multi-stage control vector parameterization method and SQP techniques. The results of this optimization process are optimal reference values and the corresponding input trajectories. The control structures applied minimize both the fuel consumption and start-up time of the boiler. (C) 2004 Published by Elsevier Ltd.
引用
收藏
页码:2239 / 2251
页数:13
相关论文
共 21 条
[1]   Drum-boiler dynamics [J].
Åström, KJ ;
Bell, RD .
AUTOMATICA, 2000, 36 (03) :363-378
[2]  
BEATO A, 1992, P IFAC COTNR POW PLA, P115
[3]  
BOCK H, 1984, P 9 IFAC WORLD C BUD
[4]  
Carslaw H. S., 1959, CONDUCTION HEAT SOLI
[5]  
COITO FJ, 1999, EUR CONTR C KARLSR G
[6]  
Diehl M., 2002, J PROCESS CONTROL
[7]  
DIEHL M, 2001, THESIS U HEIDELBERG, V920
[8]  
Emoto G., 1998, Proceedings of the 1998 IEEE International Conference on Control Applications (Cat. No.98CH36104), P1368, DOI 10.1109/CCA.1998.721684
[9]  
Franke R, 1997, COMPUTER-INTENSIVE METHODS IN CONTROL AND SIGNAL PROCESSING, P105
[10]  
FRANKE R, 1998, FORTSCHR VDI 6, V394