Single-machine scheduling problems with past-sequence-dependent delivery times

被引:49
作者
Koulamas, Christos [1 ]
Kyparisis, George J. [1 ]
机构
[1] Florida Int Univ, Dept Decis Sci & Informat Syst, Miami, FL 33199 USA
关键词
Scheduling; Single-machine; Delivery times;
D O I
10.1016/j.ijpe.2010.03.016
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider single-machine scheduling problems with past-sequence-dependent (p-s-d) job delivery times. The p-s-d delivery time is needed to remove any waiting time-induced adverse effects on the job's condition (prior to delivering the job to the customer) and it is therefore proportional to the job's waiting time. We show that single-machine scheduling problems with p-s-d delivery times and with either completion time-related criteria (such as the makespan or the total job completion time) or due date related criteria (such as the maximum lateness or the number of tardy jobs) can be solved by simple polynomial-time algorithms. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:264 / 266
页数:3
相关论文
共 7 条
[1]   Single-machine scheduling against due dates with past-sequence-dependent setup times [J].
Biskup, Dirk ;
Herrmann, Jan .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 191 (02) :586-591
[2]   SCHEDULING DETERIORATING JOBS ON A SINGLE PROCESSOR [J].
BROWNE, S ;
YECHIALI, U .
OPERATIONS RESEARCH, 1990, 38 (03) :495-498
[3]   Single-machine scheduling problems with past-sequence-dependent setup times [J].
Koulamas, Christos ;
Kyparisis, George J. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :1045-1049
[4]   An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups [J].
Kovacs, Andras ;
Brown, Kenneth N. ;
Tarim, S. Armagan .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (01) :282-291
[5]  
Lawler E., 1993, LOGISTICS PRODUCTION, DOI 10.1016/S0927-0507(05)80189-6
[6]   N JOB, ONE MACHINE SEQUENCING ALGORITHM FOR MINIMIZING THE NUMBER OF LATE JOBS [J].
MOORE, JM .
MANAGEMENT SCIENCE, 1968, 15 (01) :102-109
[7]   A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times [J].
Tahar, DN ;
Yalaoui, F ;
Chu, CB ;
Amodeo, L .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) :63-73