Minimizing flowtime and maximum earliness on a single machine

被引:18
作者
Koksalan, M [1 ]
Azizoglu, M [1 ]
Kondakci, SK [1 ]
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
关键词
D O I
10.1023/A:1007470302024
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the bicriteria scheduling problem of minimizing flowtime and maximum earliness on a single machine. The problem is known to be NP-hard. We develop heuristic procedures for generating all efficient sequences for the cases where machine idle time is either allowed or not allowed. For both cases we also discuss an algorithm that finds the best of the approximately efficient sequences for a given objective function by generating only a small subset of those sequences. We present computational results which demonstrate that the heuristic procedures and the algorithms perform very well.
引用
收藏
页码:192 / 200
页数:9
相关论文
共 21 条
[1]   ONE MACHINE SEQUENCING TO MINIMIZE MEAN FLOW TIME WITH MINIMUM NUMBER TARDY [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :585-592
[2]   GREEDY HEURISTICS FOR SINGLE-MACHINE SCHEDULING PROBLEMS WITH GENERAL EARLINESS AND TARDINESS COSTS [J].
FEDERGRUEN, A ;
MOSHEIOV, G .
OPERATIONS RESEARCH LETTERS, 1994, 16 (04) :199-208
[3]   DUAL ALGORITHM FOR ONE-MACHINE SCHEDULING PROBLEM [J].
FISHER, ML .
MATHEMATICAL PROGRAMMING, 1976, 11 (03) :229-251
[4]   A BI-CRITERION APPROACH TO MINIMIZING INVENTORY COSTS ON A SINGLE-MACHINE WHEN EARLY SHIPMENTS ARE FORBIDDEN [J].
FRY, TD ;
LEONG, GK .
COMPUTERS & OPERATIONS RESEARCH, 1987, 14 (05) :363-368
[5]   SINGLE-MACHINE SCHEDULING - A COMPARISON OF 2 SOLUTION PROCEDURES [J].
FRY, TD ;
LEONG, GK ;
RAKES, TR .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1987, 15 (04) :277-282
[6]   EXTENSION OF A RESULT ON SCHEDULING WITH SECONDARY CRITERIA [J].
HECK, H ;
ROBERTS, S .
NAVAL RESEARCH LOGISTICS, 1972, 19 (02) :403-405
[7]  
HOOGEVEEN JA, 1992, THESIS CWI AMSTERDAM
[8]  
KIRAN AS, 1991, NAV RES LOG, V38, P721, DOI 10.1002/1520-6750(199110)38:5<721::AID-NAV3220380507>3.0.CO
[9]  
2-4
[10]  
KOKSALAN MM, 1993, 9324 MIDDL E TECHN U