Coordination between vendor and buyer considering trade credit and items of imperfect quality

被引:62
作者
Chen, Liang-Hsuan [1 ]
Kang, Fu-Sen [1 ]
机构
[1] Natl Cheng Kung Univ, Dept Ind & Informat Management, Tainan 70101, Taiwan
关键词
Inventory; Imperfect items; Vendor-buyer; Delay in payment; ECONOMIC ORDER QUANTITY; CONTROLLABLE LEAD TIME; COOPERATIVE INVENTORY MODELS; LOT-SIZE MODEL; PERMISSIBLE DELAY; INTEGRATED INVENTORY; SUPPLY CHAIN; EOQ MODEL; PAYMENTS; DISCOUNT;
D O I
10.1016/j.ijpe.2009.06.043
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Vendor-buyer models for trade credit issues in the existing literature always consider the items produced as perfect. However, a number of items in a lot may be of imperfect quality. This paper extends Chen and Kang's [2007. Integrated vendor-buyer cooperative models with variant permissible delay in payments. European journal of Operational Research 183 (2), 658-673] study to develop integrated vendor-buyer models that consider a permissible delay in payment and imperfect quality to determine the optimal solutions of the buyer's order quantity and the frequency for each vendor's production run. To establish a cooperative relationship between the vendor and buyer for a win-win situation, a simple solution algorithm is presented to determine the cost saving of each side when the warranty cost per unit is increased. A numerical example is used to illustrate the results for the proposed models. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:52 / 61
页数:10
相关论文
共 31 条
[1]   A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive [J].
Abad, PL ;
Jaggi, CK .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 83 (02) :115-122
[2]   ORDERING POLICIES OF DETERIORATING ITEMS UNDER PERMISSIBLE DELAY IN PAYMENTS [J].
AGGARWAL, SP ;
JAGGI, CK .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (05) :658-662
[3]   A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR [J].
BANERJEE, A .
DECISION SCIENCES, 1986, 17 (03) :292-311
[4]   AN OPTIMAL JOINT BUYER-SELLER DISCOUNT PRICING MODEL [J].
CHAKRAVARTY, AK ;
MARTIN, GE .
COMPUTERS & OPERATIONS RESEARCH, 1988, 15 (03) :271-281
[5]   Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction [J].
Chang, HC ;
Ouyang, LY ;
Wu, KS ;
Ho, CH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 170 (02) :481-495
[6]   An application of fuzzy sets theory to the EOQ model with imperfect quality items [J].
Chang, HC .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (12) :2079-2092
[7]   Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments [J].
Chen, Liang-Hsuan ;
Kang, Fu-Sen .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (02) :658-673
[8]   Economic order quantity of deteriorating items under permissible delay in payments [J].
Chu, P ;
Chung, KJ ;
Lan, SP .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (10) :817-824
[10]   Retailer's optimal cycle times in the EOQ model with imperfect quality and a permissible credit period [J].
Chung, KJ ;
Huang, YF .
QUALITY & QUANTITY, 2006, 40 (01) :59-77