Understanding predictive uncertainty in hydrologic modeling: The challenge of identifying input and structural errors

被引:562
作者
Renard, Benjamin [1 ]
Kavetski, Dmitri [2 ]
Kuczera, George [2 ]
Thyer, Mark [2 ]
Franks, Stewart W. [2 ]
机构
[1] Irstea, UR HHLY, Hydrol Hydraul Unit, F-69336 Lyon, France
[2] Univ Newcastle, Sch Engn, Callaghan, NSW 2308, Australia
基金
澳大利亚研究理事会;
关键词
PARAMETER-ESTIMATION; CALIBRATION; IDENTIFIABILITY; OPTIMIZATION; FRAMEWORK;
D O I
10.1029/2009WR008328
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Meaningful quantification of data and structural uncertainties in conceptual rainfall-runoff modeling is a major scientific and engineering challenge. This paper focuses on the total predictive uncertainty and its decomposition into input and structural components under different inference scenarios. Several Bayesian inference schemes are investigated, differing in the treatment of rainfall and structural uncertainties, and in the precision of the priors describing rainfall uncertainty. Compared with traditional lumped additive error approaches, the quantification of the total predictive uncertainty in the runoff is improved when rainfall and/or structural errors are characterized explicitly. However, the decomposition of the total uncertainty into individual sources is more challenging. In particular, poor identifiability may arise when the inference scheme represents rainfall and structural errors using separate probabilistic models. The inference becomes ill-posed unless sufficiently precise prior knowledge of data uncertainty is supplied; this ill-posedness can often be detected from the behavior of the Monte Carlo sampling algorithm. Moreover, the priors on the data quality must also be sufficiently accurate if the inference is to be reliable and support meaningful uncertainty decomposition. Our findings highlight the inherent limitations of inferring inaccurate hydrologic models using rainfall-runoff data with large unknown errors. Bayesian total error analysis can overcome these problems using independent prior information. The need for deriving independent descriptions of the uncertainties in the input and output data is clearly demonstrated.
引用
收藏
页数:22
相关论文
共 58 条
  • [1] [Anonymous], 1902, PRINCETON U B
  • [2] Atger F, 1999, MON WEATHER REV, V127, P1941, DOI 10.1175/1520-0493(1999)127<1941:TSOEPS>2.0.CO
  • [3] 2
  • [4] A manifesto for the equifinality thesis
    Beven, K
    [J]. JOURNAL OF HYDROLOGY, 2006, 320 (1-2) : 18 - 36
  • [5] THE FUTURE OF DISTRIBUTED MODELS - MODEL CALIBRATION AND UNCERTAINTY PREDICTION
    BEVEN, K
    BINLEY, A
    [J]. HYDROLOGICAL PROCESSES, 1992, 6 (03) : 279 - 298
  • [6] So just why would a modeller choose to be incoherent?
    Beven, Keith J.
    Smith, Paul J.
    Freer, Jim E.
    [J]. JOURNAL OF HYDROLOGY, 2008, 354 (1-4) : 15 - 32
  • [7] Bras R.L., 1985, Random functions and hydrology
  • [8] Estimating the uncertain mathematical structure of a water balance model via Bayesian data assimilation
    Bulygina, Nataliya
    Gupta, Hoshin
    [J]. WATER RESOURCES RESEARCH, 2009, 45
  • [9] Uncertainty in river discharge observations: a quantitative analysis
    Di Baldassarre, G.
    Montanari, A.
    [J]. HYDROLOGY AND EARTH SYSTEM SCIENCES, 2009, 13 (06) : 913 - 921
  • [10] A dynamic rating curve approach to indirect discharge measurement
    Dottori, F.
    Martina, M. L. V.
    Todini, E.
    [J]. HYDROLOGY AND EARTH SYSTEM SCIENCES, 2009, 13 (06) : 847 - 863