摘要
We are given a set of items that must be produced in lots on a capacitated production system throughout a specified finite planning horizon. We assume that the production system is subject to random failures, and that any maintenance action carried out on the system, in a period, reduces the system's available production capacity during that period. The objective is to find an integrated lot-sizing and preventive maintenance strategy of the system that satisfies the demand for all items over the entire horizon without backlogging, and which minimizes the expected sum of production and maintenance costs. We show how this problem can be formulated and solved as a multi-item capacitated lot-sizing problem on a system that is periodically renewed and minimally repaired at failure. We also provide an illustrative example that shows the steps to obtain an optimal integrated production and maintenance strategy. (c) 2006 Published by Elsevier B.V.
引用
收藏
页码:679 / 685
页数:7
相关论文
共 15 条
[1]   SINGLE-MACHINE FLOW-TIME SCHEDULING WITH A SINGLE BREAKDOWN [J].
ADIRI, I ;
BRUNO, J ;
FROSTIG, E ;
KAN, AHGR .
ACTA INFORMATICA, 1989, 26 (07) :679-685
[2]   OPTIMUM PREVENTIVE MAINTENANCE POLICIES [J].
BARLOW, R ;
HUNTER, L .
OPERATIONS RESEARCH, 1960, 8 (01) :90-100
[3]  
Barlow RE., 1996, MATH THEORY RELIABIL
[4]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186
[5]   DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS [J].
FLORIAN, M ;
KLEIN, M .
MANAGEMENT SCIENCE SERIES A-THEORY, 1971, 18 (01) :12-20
[6]  
Graves GH, 1999, NAV RES LOG, V46, P845, DOI 10.1002/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO
[7]  
2-#
[8]   Two-machine flow shops with limited machine availability [J].
Kubiak, W ;
Blazewicz, J ;
Formanowicz, P ;
Breit, J ;
Schmidt, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 136 (03) :528-540
[9]  
Lee C.Y., 2004, Handbook of scheduling: Algorithms, Models, and Performance Analysis, Computer and Information Science Series, p22.1