Impact of Strategic Deployment of CHP-Based DERs on Microgrid Reliability

被引:97
作者
Basu, Ashoke Kumar [1 ]
Chowdhury, Sunetra [2 ]
Chowdhury, S. P. [2 ]
机构
[1] CIEM, Dept Elect Engn, Kolkata 700040, India
[2] Univ Cape Town, Dept Elect Engn, ZA-7701 Cape Town, South Africa
关键词
Benefit-to-cost ratio; energy resources; energy storages; particle swarm optimization (PSO); reliability;
D O I
10.1109/TPWRD.2010.2047121
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Optimal deployment, with respect to locations, capacity sizes, and types of distributed energy resources (DERs), which are the main components in a microgrid system, are chosen for study in this paper. For the selection of optimal locations of DERs, the loss sensitivity index of each bus is taken into account. Whereas optimal size and its separation among microturbines, diesel generators and combustion turbines at each bus location are performed on the basis of the maximum benefit-to-cost ratio of the microgrid owner, obtained by using the particle swarm optimization technique and with respect to their reliable catering and quality of power as well as heat (i.e., combined-heat-and-power (CHP) operation) for customers. This paper conducts four separate case studies-two on 6-bus systems (radial and meshed) and resting on 14-bus systems (the IEEE system and radial system)-to show how much these systems are economically feasible for investment planning when cost and CHP benefits of various types of DERs are taken into account. Load profiles, tariffs, as well as the constructional cost of the microgrid itself are addressed in the six-bus meshed network and its central DER location in a district-heating paradigm is also done separately.
引用
收藏
页码:1697 / 1705
页数:9
相关论文
共 33 条
[1]  
ABDELAZIZ AR, 2003, IEEE BOL POWERTECH C
[2]  
[Anonymous], 1999, POWER SYSTEM TEST CA
[3]  
[Anonymous], APPR FUEL CONS CHART
[4]  
Asano H., 2006, 29 IAEE INT C POTSD
[5]  
Basu AK, 2009, IEEE POW ENER SOC GE, P1720
[6]  
*CA EN COMM, CAL DISTR EN RES GUI
[7]  
Costa P.M., 2006, P 2006 INT C PROB ME, P1, DOI [10.1109/PMAPS.2006.360236, DOI 10.1109/PMAPS.2006.360236]
[8]   Planning for distributed generation [J].
Dugan, RC ;
McDermott, TE ;
Ball, GJ .
IEEE INDUSTRY APPLICATIONS MAGAZINE, 2001, 7 (02) :80-88
[9]  
*ENV PROT AG, 2003, BRIEF CHAR GAS TURB
[10]  
*FIN EN IND, 2009, EN