Application of Analytic Hierarchy Process-Grey Target Theory Systematic Model in Comprehensive Evaluation of Water Environmental Quality

被引:25
作者
Wu, Jun [2 ,3 ]
Tian, Xiaogang [1 ]
Tang, Ya [3 ]
Zhao, Yujie [4 ]
Hu, Yandi [4 ]
Fang, Zili [5 ]
机构
[1] Nankai Univ, Coll Environm Sci & Engn, Tianjin 300071, Peoples R China
[2] Sichuan Agr Univ, Dept Environm Sci & Engn, Yaan, Peoples R China
[3] Sichuan Univ, Coll Architecture & Environm, Chengdu 610064, Peoples R China
[4] Minist Agr, Monitoring Inst Environm Protect Res, Tianjin, Peoples R China
[5] Sichuan Inst Sci & Technol Environm Protect, Chengdu, Peoples R China
关键词
evaluation and forecast of water environment; analytic hierarchy process; grey target theory; water environmental forecast; MANAGEMENT; OPTIMIZATION; EXPANSION; SKIP; HOP;
D O I
10.2175/106143009X12529484816231
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Comprehensive evaluation of the water environment for effective water quality management is complicated by a considerable number of factors and uncertainties. It is difficult to combine micro-evaluation with the macro-evaluation process. To effectively eliminate the subjective errors of the traditional analytic hierarchy process (AHP), a new modeling approach-the analytic hierarchy process and grey target theory (AHP-GTT) systematic model-is presented in this study to evaluate water quality in a certain watershed. A case study of applying the AHP-GTT systematic model to the evaluation and analysis of the water environment was conducted in the Yibin section of the Yangtze River, China. The micro-evaluation is based on defining the weights of indices of the water quality (IWQ) of each water cross-section, while the macro-evaluation is based on calculating the comprehensive indices of water environmental quality and analyzing the tendency of the water environment of each cross-section. The results indicated that the Baixi and Shuidongmen sections are seriously polluted areas, with the tendencies of becoming worse. Also, the key IWQs of these two cross-sections are 5-day biochemical oxygen demand and chemical oxygen demand of permanganate, respectively. Water Environ. Res., 82, 633 (2010).
引用
收藏
页码:633 / 641
页数:9
相关论文
共 27 条
  • [1] [Anonymous], RES ENV SCI
  • [2] Analyzing hazard potential of typhoon damage by applying grey analytic hierarchy process
    Cheng, SP
    Wang, RY
    [J]. NATURAL HAZARDS, 2004, 33 (01) : 77 - 103
  • [3] DENG JL, 2002, BASE GREY THEORY, P221
  • [4] FANG Y, 2005, J WATER RESOUR WATER, V16, P46
  • [5] A grey hop, skip, and jump approach: Generating alternatives for expansion planning of waste management facilities
    Huang, GH
    Baetz, BW
    Patry, GG
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (06) : 1207 - 1219
  • [6] GREY DYNAMIC-PROGRAMMING FOR WASTE-MANAGEMENT PLANNING UNDER UNCERTAINTY
    HUANG, GH
    BAETZ, BW
    PATRY, GG
    [J]. JOURNAL OF URBAN PLANNING AND DEVELOPMENT-ASCE, 1994, 120 (03): : 132 - 156
  • [7] JING JL, 2001, ACTA SCI CIRCUMSTANT, V21, P431
  • [8] JLIUS S, 2003, ENVIRON IMPACT ASSES, V23, P283
  • [9] LI RZ, 2005, J HARBIN I TECHNOL, V37, P85
  • [10] [刘孟兰 Liu Menglan], 2005, [海洋环境科学, Marine Environmental Science], V24, P36