Optimizing scheduling of post-earthquake electric power restoration tasks

被引:119
作者
Xu, Ningxiong
Guikema, Seth D.
Davidson, Rachel A.
Nozick, Linda K.
Cagnan, Zehra
Vaziri, Kabeh
机构
[1] Cornell Univ, Sch Civil & Environm Engn, Ithaca, NY 14853 USA
[2] Texas A&M Univ, Dept Civil Engn, College Stn, TX 77843 USA
[3] Bogazici Univ, Dept Earthquake Engn, Earthquake Res Inst, TR-34684 Istanbul, Turkey
[4] Bogazici Univ, Kandilli Observ, TR-34684 Istanbul, Turkey
关键词
electric power; lifeline; restoration; risk management; optimization; genetic algorithm;
D O I
10.1002/eqe.623
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a stochastic integer program developed to determine how to schedule inspection, damage assessment, and repair tasks so as to optimize the post-earthquake restoration of the electric power system. The objective of the optimization is to minimize the average time each customer is without power, and a genetic algorithm is used to solve it. The effectiveness of the schedules recommended by the optimization are evaluated by running a detailed discrete event simulation model of the restoration process with both the optimization-generated schedules and the power company's original schedules, and comparing the resulting restorations according to three measures-average time each customer is without power, time required to restore 90% of customers, and time required to restore 98% of customers. The optimization and simulation models both consider all the earthquakes that could affect the power system and represent the uncertainty surrounding expected restoration times. The models were developed through an application to the Los Angeles Department of Water and Power (LADWP) electric power system, but the general approach is extendable to other electric power systems, other lifelines, and other hazards. Copyright (C) 2006 John Wiley & Sons, Ltd.
引用
收藏
页码:265 / 284
页数:20
相关论文
共 39 条
  • [1] ANDO T, 1987, P REC ADV LIF EARTHQ, P187
  • [2] [Anonymous], 1999, PROJECT SCHEDULING L
  • [3] ARGOTHY V, 2003, 3331 U DEL DIS RES C
  • [4] SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY
    BLAZEWICZ, J
    LENSTRA, JK
    KAN, AHGR
    [J]. DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) : 11 - 24
  • [5] A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    Bouleimen, K
    Lecocq, H
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 268 - 281
  • [6] Resource-constrained project scheduling: Notation, classification, models, and methods
    Brucker, P
    Drexl, A
    Mohring, R
    Neumann, K
    Pesch, E
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) : 3 - 41
  • [7] Cagnan Z., 2005, THESIS CORNELL U
  • [8] CAGNAN Z, 2007, IN PRESS INT J RISK
  • [9] Post-earthquake restoration planning for Los Angeles electric power
    Cagnan, Zehra
    Davidson, Rachel A.
    Guikema, Seth D.
    [J]. EARTHQUAKE SPECTRA, 2006, 22 (03) : 589 - 608
  • [10] Chang S. E., 2000, Earthquake Spectra, V16, P557, DOI DOI 10.1193/1.1586127