An integrated approach to disassembly planning and demanufacturing operation

被引:11
作者
Tang, Y [1 ]
Zhou, MC [1 ]
Caudill, RJ [1 ]
机构
[1] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
来源
PROCEEDINGS OF THE 2000 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT | 2000年
关键词
D O I
10.1109/ISEE.2000.857674
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This papa presents a disassembly planning and demanufacturing scheduling method for an integrated flexible demanufacturing system (IFDS). Workstation Petri net (WPN) and Product Petri net (PPN) are proposed for hierarchical and modular modeling in order to derive the optimal disassembly path with the maximal end-of-life (EOL) value. Resource Petri net (RPN) is introduced to deal with the demanufacturing facilities. The proposed methodology and algorithms are demonstrated through the disassembly of personal computers in IFDS.
引用
收藏
页码:354 / 359
页数:6
相关论文
共 16 条
[1]   A CORRECT AND COMPLETE ALGORITHM FOR THE GENERATION OF MECHANICAL ASSEMBLY SEQUENCES [J].
DEMELLO, LSH ;
SANDERSON, AC .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (02) :228-240
[2]   AND OR GRAPH REPRESENTATION OF ASSEMBLY PLANS [J].
DEMELLO, LSH ;
SANDERSON, AC .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1990, 6 (02) :188-199
[3]  
GRENCHUS E, 1997, IEEE INT S EL ENV SA, P157
[4]  
KOOI E, 1996, P 1 INT WORK SEM REU, P205
[5]  
Kopacek P., 1996, Proceedings. 1996 IEEE Conference on Emerging Technologies and Factory Automation. EFTA '96 (Cat. No.96TH8238), P567, DOI 10.1109/ETFA.1996.573938
[6]  
Penev Kiril D., 1994, IND ENG, V26, P50
[7]  
SUZUKI T, 1993, IEEE INT C ROB AUT M
[8]  
TANG Y, 2000, IEEE INT C ROB AUT S
[9]   STRATEGIC ISSUES IN PRODUCT RECOVERY MANAGEMENT [J].
THIERRY, M ;
SALOMON, M ;
VANNUNEN, J ;
VANWASSENHOVE, L .
CALIFORNIA MANAGEMENT REVIEW, 1995, 37 (02) :114-135
[10]  
THOMAS JP, 1994, IEEE T ROB AUT, V12