An experimental benchmarking of two multi-agent architectures for production scheduling and control

被引:44
作者
Cavalieri, S [1 ]
Garetti, M [1 ]
Macchi, M [1 ]
Taisch, M [1 ]
机构
[1] Politecn Milan, Dipartimento Econ & Prod, I-20133 Milan, Italy
关键词
multi-agent systems; manufacturing; scheduling;
D O I
10.1016/S0166-3615(00)00063-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The paper provides a first experimental contribution to the validation and comparison of multi-agent heterarchical architectures in order to point out their limits, their main peculiarities and real applicability. For this purpose, the behaviours of two particular control solutions, characterised by a different degree of decision-making delegation assigned to physical and information units in the production system, have been simulated. The experimental campaign is divided into three trials, in order to measure the performances of the two architectures not only under stable and predictable conditions, but also in case of unexpected events, such as the release of urgent manufacturing orders and the occurrence of failures in production resources. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:139 / 152
页数:14
相关论文
共 10 条
  • [1] THE EVOLUTION OF CONTROL ARCHITECTURES FOR AUTOMATED MANUFACTURING SYSTEMS
    DILTS, DM
    BOYD, NP
    WHORMS, HH
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 1991, 10 (01) : 79 - 93
  • [2] Ant system: Optimization by a colony of cooperating agents
    Dorigo, M
    Maniezzo, V
    Colorni, A
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 1996, 26 (01): : 29 - 41
  • [3] Multi-agent Mediator architecture for distributed manufacturing
    Maturana, FP
    Norrie, DH
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 1996, 7 (04) : 257 - 270
  • [4] Rabelo R. J., 1996, Studies in Informatics and Control, V5, P89
  • [5] NEGOTIATION IN MULTIAGENT BASED DYNAMIC SCHEDULING
    RABELO, RJ
    CAMARINHAMATOS, LM
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1994, 11 (04) : 303 - 309
  • [6] DYNAMIC SCHEDULING IN CELLULAR MANUFACTURING SYSTEMS - A FRAMEWORK FOR NETWORKED DECISION-MAKING
    SHAW, MJ
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 1988, 7 (02) : 83 - 94
  • [7] SOLBERG JJ, 1992, IIE T, V24, P57
  • [8] SOLBERG JJ, 1994, COMPUTER CONTROL FLE, P169
  • [9] Reference architecture for holonic manufacturing systems: PROSA
    Van Brussel, H
    Wyns, J
    Valckenaers, P
    Bongaerts, L
    Peeters, P
    [J]. COMPUTERS IN INDUSTRY, 1998, 37 (03) : 255 - 274
  • [10] ZWEGERS AJR, 1996, P ADV PROD MAN SYST, P293