Asset planning-for water reticulation systems - the PARMS model

被引:24
作者
Burn, S [1 ]
Tucker, S [1 ]
Rahilly, M [1 ]
Davis, P [1 ]
Jarrett, R [1 ]
Po, M [1 ]
机构
[1] CSIRO, Bldg Construct & Engn, Highett, Vic 3190, Australia
来源
3RD WORLD WATER CONGRESS: WATER SERVICES MANAGEMENT, OPERATIONS AND MONITORING | 2003年 / 3卷 / 1-2期
关键词
planning models; pipe failure; pipe lifetimes; pipelines; whole life costing;
D O I
10.2166/ws.2003.0086
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Traditionally water reticulation systems have been operated so that pipeline repair/renewal occurs on a reactive basis, based upon the number of failures, the consequence of failure and the cost. Planning for future replacements and the costs associated with these has been based upon a best guess of pipe lifetimes, which have generally been very conservative, when compared to the actual. pipe life obtained. Factors such as the required level of customer service, trade-offs between repair and renewal, or operating practices such as pressure reduction or shut-off block reduction have not been widely considered, except when they are required under the water authorities operating licence. To allow long-term strategies to be implemented for the repair/renewal of water pipelines, a Pipeline Asset and Risk Management System (PARMS) is being developed. This planning model has been designed to-allow a range of "what if" scenarios to be analysed to determine their effects on water authorities' long-term costs. This model is based upon whole of life costing and includes data on externality and customer impact costs. It analyses the failures of individual pipe assets, rather than the traditional practice of predicting failure of pipe cohorts, currently used by many authorities. This paper discusses the application of the FARMS planning model to allow selection of pipeline repair/renewal, and briefly analyses the influences that a range of customer service or operating decisions can have on a water authority's capital and operational expenditure.
引用
收藏
页码:55 / 62
页数:8
相关论文
共 20 条
[1]  
BARTLETT E, 2001, CIB WORLD BUILD C 20
[2]  
CHANG SE, 1997, P INT C OPT PERF CIV, P58
[3]  
CONSTANTINE AG, 1998, 145 UWRAA
[4]  
CROMWELL J, 2001, 462 AWWARF
[5]  
DAVIS P, 2001, PIPES WAGGA WAGGA 15
[6]  
Deb A. K., 1998, Quantifying future rehabilitation and replacement needs of water mains
[7]  
DESILVA D, 2002, NO DIG 2002
[8]   Valuing water supply reliability [J].
Griffin, RC ;
Mjelde, JW .
AMERICAN JOURNAL OF AGRICULTURAL ECONOMICS, 2000, 82 (02) :414-426
[9]  
Hadzilacos T., 2000, Computers, Environment and Urban Systems, V24, P215, DOI 10.1016/S0198-9715(99)00058-7
[10]  
Herz RK, 1996, J WATER SUPPLY RES T, V45, P221